My neighbour's extension cracked our shared wall: what now?
Get a structural assessment and report. We inspect the wall, record the damage and recommend the repair; a contractor carries out the repair.
Get the wall assessed before anything else. Structural Solutions inspects the shared wall, records the cracks and any movement, checks the cause, and issues a stamped structural report with recommendations. The repair is then carried out by a contractor, following the report. Building next to a shared wall needs the neighbour's consent, and the report documents the condition of the wall for you and for the developer or authority.
What you need to know
- Neighbour consent: Building next to a shared wall needs the neighbour's consent.
- Assessment: We inspect, record and check the cause.
- Report: Stamped findings and recommendations.
- Repair: Carried out by a contractor, following the report.
Documents you may need
- Title deed and owner ID
- Affection plan or site plan
- Existing drawings or as-built drawings
- Photos of the area
- Developer NOC (where the community has a developer)
Who does what
Step by step
We confirm the exact route for your project.
| Step | Approval route | Guides |
|---|---|---|
| Site visit Structural Solutions | We inspect the structure, the cracks, the loads and any changes made. | — |
| Checks and calculations Structural Solutions | We check the structure against the loads and the codes. | Structural calculations |
| Stamped report Structural Solutions | Findings and recommendations in a stamped report. | Structural reports |
| Repairs A contractor | Repairs are carried out by a contractor, following the report. | — |
| Approvals Developer and authority | Where repairs or changes need a NOC or permit, we apply. | Approvals |
Questions
Related questions
Is a cracked shared wall dangerous?
It depends on the cracks and their cause. An assessment tells you.
Do you repair the wall?
No. We assess and report; a contractor carries out the repair.
Can the report be shared with the developer?
Yes. It documents the condition of the wall.
Did my neighbour need my consent?
Yes. Building next to a shared wall needs the neighbour's consent.
Related guides
Keep reading
Related
