How do I know if my slab can take a new load?

A structural engineer checks the slab, beams and supports against the new load, such as a jacuzzi, tank, gym or heavy equipment.

The short answer

Only a structural check can tell you. Structural Solutions reviews the existing drawings or inspects the slab, works out the new load, such as a jacuzzi, water tank, gym equipment, planters or heavy machinery, and checks the slab, beams, columns and supports against it. If the slab is not enough, we design the strengthening and prepare stamped calculations for the approvals.

CheckSlab, beams and supports
LoadsJacuzzi, tank, gym, equipment
If neededStrengthening design

What you need to know

  • Existing drawings: Help confirm the slab design.
  • Site check: Where drawings are missing.
  • Strengthening: Designed and stamped if needed.
  • Approvals: NOC and permit where the works need them.

Documents you may need

  • Title deed and owner ID
  • Affection plan or site plan
  • Existing drawings or as-built drawings
  • Photos of the area
  • Developer NOC (where the community has a developer)

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Site visit
Structural Solutions
We inspect the structure, the cracks, the loads and any changes made.—
Checks and calculations
Structural Solutions
We check the structure against the loads and the codes.Structural calculations
Stamped report
Structural Solutions
Findings and recommendations in a stamped report.Structural reports
Repairs
A contractor
Repairs are carried out by a contractor, following the report.—
Approvals
Developer and authority
Where repairs or changes need a NOC or permit, we apply.Approvals

Questions

Related questions

Can my roof take a jacuzzi?

It depends on the slab. We check it.

What if I have no drawings?

We inspect the slab and can survey it.

Is a gym on an upper floor OK?

It depends on the equipment and slab; we check it.

Do I need approval?

For structural changes and strengthening, yes.