What is a structural report and who accepts it?
A structural report is an engineer's stamped assessment of a structure or proposed change. Developers and authorities such as Dubai Municipality, DDA and Trakhees accept reports from an approved consultant, for example for wall removals, existing works, change of use or safety concerns.
The short answer
A structural report records what the engineer inspected, the findings and the conclusions, such as whether a wall can be removed, whether existing works are safe, or whether a slab can carry a new load. Stamped by an approved consultant, it supports approvals, retrospective approvals and decisions by owners and buyers.
What you need to know
- Wall removal: Confirms the wall and the replacement design.
- Existing works: Supports retrospective approval.
- Change of use: Confirms the structure suits the new use.
- Safety: Cracks, damage or overloading concerns.
Documents you will need
- Plans or drawings
- Photos
- The reason the report is needed
Who does what
Step by step
We confirm the exact route for your property.
| Step | Approval route | Guides |
|---|---|---|
| Inspection Structural Solutions | Site visit and checks. | — |
| Analysis Structural Solutions | Calculations where needed. | Structural calculations in Dubai |
| Stamped report Structural Solutions | Findings and conclusions. | Report for DM |
Questions
Related questions
Does Dubai Municipality accept structural reports?
Yes, from an approved consultant.
Do I need a report for a retrospective approval?
Often yes, together with as-built drawings.
Is a report the same as calculations?
A report presents findings; calculations support it where needed.
Do you repair the cracks?
No. We assess and report as independent engineers; the repairs are done by a contractor, following our recommendations.
What does Structural Solutions do?
We inspect, analyse and issue stamped structural reports.
Related guides
