Maple Townhouse Pergola Rules
A Maple townhouse pergola goes in the back garden, open on all sides, up to 2.8 m high, and no more than 10% of the plot or 20 m².
A Maple townhouse pergola is allowed in the back garden and not in the front. All pergolas together can cover no more than 10% of the plot area or 20 m², whichever is less. It should be at least 0.6 m from the boundary walls, and written neighbour consent is needed to place it next to a shared boundary wall. The height can be just above the door and window lintel level, up to 2.8 m. It must stay open on all sides, with no glass, doors, sheets or canvas, and cannot be used as a habitable space. Colours are dark brown, dark grey or white.
Emaar’s guide
Pergola rules in Maple
From Emaar’s Maple Townhouses guide (April 2022). Emaar reviews every application.
| Item | What the guide says |
|---|---|
| Location | Back garden. None in the front garden |
| Coverage | All pergolas together: 10% of the plot or 20 m², whichever is less |
| Boundary | At least 0.6 m, and written neighbour consent next to a shared wall |
| Height | Just above lintel level, up to 2.8 m |
| Sides | Open on all sides, no enclosure |
| Finish | Dark brown, dark grey or white, in a wooden texture or smooth finish |
Official sites: Emaar · Dubai Development Authority
Maple townhouse pergola rules at a glance
- Attached: It can be attached to the townhouse, 0.6 m from the side and rear walls.
- Enclosure: Never enclosed with glass, sheets or canvas.
- Colours: Dark brown, dark grey or white.
- Calculations: Steel and larger structures need stamped calculations.
Documents you will need
- Title deed and owner ID
- Existing and proposed drawings and elevations
- Detailed scope of works
- Photos of the townhouse
- Contractor or consultant licence
- Building Completion Certificate
How it works
From idea to approval in Maple
1. Check
We check your idea against Emaar’s Maple guide and your plot.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved.
6. Completion
Emaar and DDA inspections, and the completion certificate.
Who does what
Who is involved
Structural Solutions
Checks your idea, prepares the drawings and stamped calculations, and handles the Emaar NOC and DDA permit. We are a consultancy, not Emaar or DDA.
Maple townhouse rules →Dubai Development Authority (DDA)
Issues the building permit for structural works, after the Emaar NOC.
DDA approvals →Maple guides
Why applications come back
- Design does not follow Emaar’s Maple guide
- Materials or colours do not match the townhouse
- Neighbour NOC missing where it is needed
- Works started before the NOC
Questions
Questions people ask
How big can my pergola be?
All pergolas together can cover no more than 10% of the plot or 20 m², whichever is less.
Can it go in the front garden?
No.
Can I attach it to the townhouse?
Yes, at least 0.6 m from the boundary walls.
Can I enclose it with glass?
No, it must stay open on all sides.