Maple · Dubai Hills townhouses

Maple Townhouse Swimming Pool Rules

A Maple townhouse swimming pool goes in the back garden, 1.5 m from the building and boundary wall, and up to 1.8 m deep.

A Maple townhouse swimming pool can be installed in the back garden. A side garden is possible only with a 6 m setback or more, or on corner plots with different layouts. The pool should be at least 1.5 m from the building and the boundary wall, no deeper than 1.8 m from natural ground level, with the deck no more than 30 cm above it. Emaar’s guide asks for a protecting fence of at least 90 cm with a lockable door and alarm, citing Dubai Municipality Circular 197. The fence can be removed with an undertaking letter from the landlord (the property owner). No additional electrical load is provided for the pool.

WhereBack garden
Distance1.5 m minimum
Depth1.8 m maximum

Emaar’s guide

Pool rules in Maple

From Emaar’s Maple Townhouses guide (April 2022). Emaar reviews every application.

ItemWhat the guide says
LocationBack garden. Side only with a 6 m setback or corner plot
DistanceAt least 1.5 m from the building and boundary wall
DepthUp to 1.8 m from natural ground level
DeckNo more than 30 cm above natural ground level
Pump roomUnderground, away from the boundary wall foundation
FenceMinimum 90 cm with a lockable door and alarm, or removed with the landlord’s undertaking letter
BackwashPressure-breaking chamber to drainage, or a cartridge filter
DewateringPermit or NOC from DM or DDA first
ElectricalNo additional load

Official sites: Emaar · Dubai Development Authority

Maple townhouse swimming pool rules at a glance

  • Pool fence: Can be removed with an undertaking letter from the landlord (the property owner).
  • Backwash: A pressure-breaking chamber or a cartridge filter system.
  • Dewatering: A permit or NOC first, and into the storm water system, not sewerage.
  • Filling: A pool can be filled and run before the final inspection.

Documents you will need

  • Title deed and owner ID
  • Existing and proposed drawings and elevations
  • Detailed scope of works
  • Photos of the townhouse
  • Contractor or consultant licence
  • Building Completion Certificate

How it works

From idea to approval in Maple

1. Check

We check your idea against Emaar’s Maple guide and your plot.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved.

6. Completion

Emaar and DDA inspections, and the completion certificate.

Who does what

Who is involved

📐

Structural Solutions

Checks your idea, prepares the drawings and stamped calculations, and handles the Emaar NOC and DDA permit. We are a consultancy, not Emaar or DDA.

Maple townhouse rules →
🏘️

Emaar

Reviews the design and issues the NOC.

Emaar approvals →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works, after the Emaar NOC.

DDA approvals →

Why applications come back

  • Design does not follow Emaar’s Maple guide
  • Materials or colours do not match the townhouse
  • Neighbour NOC missing where it is needed
  • Works started before the NOC

Questions

Questions people ask

Where can my pool go?

In the back garden, or a side garden with a 6 m setback or more, or on some corner plots.

How close to the wall can it be?

At least 1.5 m from the building and boundary wall.

How deep can it be?

Up to 1.8 m from natural ground level.

Do I need a pool fence?

The guide asks for one, and it can be removed with an undertaking letter from the landlord (the property owner).

Do I need an environmental NOC?

Yes, from the Dubai Municipality Environment Department.

Related guides

Keep reading