Maple Townhouse Gazebo and Fabric Shade Rules
A Maple townhouse gazebo goes in the back garden and cannot attach to the house. Fabric shades can go at the rear or sides. Here are Emaar’s limits.
A Maple townhouse gazebo is allowed in the back garden, at least 0.6 m from the boundary walls and the townhouse. Side gardens are possible only with a 6 m setback or more, or on corner plots with different layouts. All gazebos together can cover 10% of the plot or 20 m², whichever is less, with an apex of up to 2.8 m and eaves up to 2.4 m. Thatched and tiled roofs are not allowed. Fabric shades can go at the rear or sides, at least 0.6 m from the boundary walls, between 2.4 m and 2.8 m high, in beige or light grey. Cantilevered awnings and window canopies are not allowed.
Emaar’s guide
Gazebo and shade rules in Maple
From Emaar’s Maple Townhouses guide (April 2022). Emaar reviews every application.
| Item | Gazebo | Fabric shade |
|---|---|---|
| Where | Back garden; side only with 6 m setback or corner plot | Rear and side gardens |
| Coverage | 10% of plot or 20 m², whichever is less | 10% of plot or 20 m², whichever is less |
| Distance | 0.6 m from boundary walls and the townhouse | 0.6 m from boundary walls |
| Height | Apex up to 2.8 m, eaves up to 2.4 m | Up to 2.8 m, lowest point 2.4 m |
| Colour | Dark brown or dark grey | Beige or light grey, matching the townhouse |
Official sites: Emaar · Dubai Development Authority
Maple townhouse gazebo and fabric shade limits
- Front garden: No gazebos or fabric shades.
- Thatched or tiled roofs: Not allowed.
- Fabric shade posts: Free-standing poles, not anchored in the common boundary wall.
- Awnings: Cantilevered awnings and window canopies are not allowed.
Documents you will need
- Title deed and owner ID
- Existing and proposed drawings and elevations
- Detailed scope of works
- Photos of the townhouse
- Contractor or consultant licence
- Building Completion Certificate
How it works
From idea to approval in Maple
1. Check
We check your idea against Emaar’s Maple guide and your plot.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved.
6. Completion
Emaar and DDA inspections, and the completion certificate.
Who does what
Who is involved
Structural Solutions
Checks your idea, prepares the drawings and stamped calculations, and handles the Emaar NOC and DDA permit. We are a consultancy, not Emaar or DDA.
Maple townhouse rules →Dubai Development Authority (DDA)
Issues the building permit for structural works, after the Emaar NOC.
DDA approvals →Maple guides
Why applications come back
- Design does not follow Emaar’s Maple guide
- Materials or colours do not match the townhouse
- Neighbour NOC missing where it is needed
- Works started before the NOC
Questions
Questions people ask
Can a gazebo attach to my townhouse?
No, it must stay at least 0.6 m away.
Can I have a thatched roof?
No, thatched and tiled roofs are not allowed.
Where can a fabric shade go?
At the rear or sides, not in the front garden.
Can I fix a shade to the boundary wall?
No post can be anchored in the common boundary wall.