Making an Opening in a Load-Bearing Wall in Dubai

A load-bearing wall can often take an opening. The order of work is what keeps it safe.

An opening in a load-bearing wall is made by supporting the load first, then cutting. Our engineers design the new beam or lintel, the bearings at each end and the temporary propping, and set the sequence: props in, opening cut, beam installed, bearings packed, then props out. The design goes with the NOC and the authority permit.

What we check first

  • Wall: Load-bearing or partition
  • Structure: Slab, beams, columns above
  • Material: Block, concrete or precast
  • Opening: Width and position
  • Records: As-built drawings or survey
  • Route: NOC, then authority

Documents you will need

  • Photos of the wall from both sides, and the ceiling above
  • Villa or unit number and community or building
  • As-built drawings, if you have them
  • Title deed and owner ID, or tenancy for shops and offices

Route

How a wall change is approved

The structural check comes first. The NOC and permit follow the area and the property type.

StepApproval routeGuides
Structural check
Our engineers
As-built drawings, or a site survey, to confirm whether the wall carries load.Is my wall load-bearing?
Design
Structural Solutions
Beam or lintel design, stamped structural calculations and drawings.—
NOC
Developer, landlord or building management
Villas in a community: developer NOC. Apartments, offices and shops: building management or landlord NOC.—
Permit
The authority for the area
DM, DDA, Trakhees or the area authority, for the structural works.Wall opening permit
Works
Your contractor
To the approved drawings, with temporary propping where needed.—
Completion
Authority and developer
Inspection and completion of the works.Wall opening sign-off

How it works

How it works

1. Send photos

The wall, the ceiling and what you want.

2. Records

As-built drawings, or a survey.

3. Structural check

Load-bearing or not, and what is above.

4. Design

Beam or lintel, stamped calculations.

5. NOC and permit

Developer, landlord or BM, then the authority.

6. Works and completion

Propping, works, inspection.

Planning a wall change?

Check the wall first

Send us three things on WhatsApp:

  1. Photos of the wall and the ceiling above
  2. Your community or building, and unit number
  3. What you want to open or remove

Our engineers check whether the wall carries load, design the beam or support and handle the NOC and the permit.

Questions

Questions

Can every load-bearing wall take an opening?

Many can. The width and position depend on what the wall carries.

What is temporary propping?

Props that hold the slab above while the wall is cut and the beam goes in.

When can the props come out?

When the beam and bearings are complete, as set in the design.

Do the beam ends need new columns?

Sometimes, if the wall at each end cannot carry the beam.

Who checks the works?

The authority inspects; our engineers can visit too.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.