Kitchen Extension in Emirates Hills: Emaar NOC and Permit

A bigger kitchen, a show kitchen or a separate service kitchen: how it is approved.

A kitchen extension in Emirates Hills needs the Emaar NOC and a Dubai Municipality building permit with stamped calculations. It adds floor area, which Emaar reviews against the plot and the guidelines; there is no single percentage in Emirates Hills. Emaar charges on the added GFA: AED 1,000 per sq ft up to 10%, and AED 3,000 to AED 6,000 per sq ft above 10%, subject to Emaar Management approval. Opening into the extension often means changing a load-bearing wall, so we check the structure first.

Lakeside villas in Emirates Hills, Dubai
Emirates Hills, Dubai
Kitchen Extension in Emirates Hills: Emaar NOC and Permit

Official sources: Emaar · Dubai Municipality

What we check first

  • Wall: Opening into the extension
  • Area: Added GFA
  • Plot: Setbacks
  • Services: Drainage, gas, exhaust
  • Roof: Joining the existing roof
  • Look: Matches the villa

Documents you will need

  • Villa and plot number in Emirates Hills
  • Title deed and owner ID
  • Approved plans, if you have them
  • Photos and a short description of the idea

Route

The approval route in Emirates Hills

Emaar first, then Dubai Municipality. We confirm the route for your villa.

StepApproval routeGuides
Early check
Our engineers
Your idea, the plot and the approved plans, or a site survey.As-built drawings
Drawings
Structural Solutions
Drawings and stamped structural calculations.Structural calculations
Emaar NOC
Emaar
Reviews the design against the Emirates Hills guidelines and issues the NOC.Emirates Hills NOC
DM permit
Dubai Municipality
Building permit, submitted by us as your consultant.Building permit
Works
Your contractor
Built to the approved drawings.—
Completion
Emaar and Dubai Municipality
Inspections, Emaar clearance and the completion certificate.Completion certificate

How it works

How it works

1. Send us the idea

Villa or plot number and what you want.

2. Plans

Approved plans, or a survey.

3. Early check

Guidelines, plot and structure.

4. Drawings

Drawings and calculations.

5. Emaar NOC

We apply for you.

6. DM permit

Then works and completion.

What causes problems

  • Changing a load-bearing wall without a design
  • Building in the setbacks
  • Gas moved without approval

Villa in Emirates Hills?

Check your idea first

Send us three things on WhatsApp:

  1. Villa or plot number
  2. Photos or plans
  3. What you want to do

We check the Emaar guidelines and the structure, then handle the Emaar NOC and the Dubai Municipality permit.

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Kitchen Extension in Emirates Hills: Emaar NOC and Permit

Questions

Questions

Does a kitchen extension add GFA?

Yes, it adds enclosed floor area.

Who approves it?

Emaar first, then Dubai Municipality.

What if it was already built?

Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.