How Much Bigger Can My Emirates Hills Villa Be?
How Much Bigger Can My Emirates Hills Villa Be? It depends on the plot, the setbacks and the Emirates Hills guidelines; Emaar Community Management reviews each design.
The short answer
Emirates Hills villas sit on large plots and many are custom-built, so there is no single extension percentage. What you can add depends on the plot, the setbacks, the existing floor area and the Emirates Hills guidelines, and Emaar Community Management reviews each design. We check your plot before designing. The allowance is measured on the existing floor area from the as-built plans, so we measure it first. Anything that adds enclosed floor area counts: garden rooms, maid rooms, closed balconies, roof rooms and converted outdoor spaces.

Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The Dubai Municipality or DDA permit fee is separate.
What we check first
- Plot and setbacks: where an extension, pergola or pool can go on your plot.
- Structure: walls, slabs, columns and foundations before any opening or new load.
- Existing floor area: measured from the approved plans and on site.
- Unapproved works: older changes are surveyed and approved before new works.
Documents you will need
- Photos of the villa and the area you want to change
- Villa and plot number in Emirates Hills
- Title deed and owner ID
- A sketch or short description of the idea
- Approved villa plans, if you have them
Who does what
The approval route in Emirates Hills
Emirates Hills is part of Emirates Living: Emaar first, then Dubai Municipality. We confirm the exact route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Design Structural Solutions | Site check, drawings and stamped structural calculations, using the approved plans or a site survey. | — |
| Emaar NOC Emaar Community Management | NOC through the Emaar Community Portal. Emaar reviews the design and confirms its fees. | Emaar extension fees |
| Permit Dubai Municipality | Building permit for structural works and added floor area, submitted by an approved consultant. | — |
| Inspections Emaar and Dubai Municipality | Inspections during and after the works; the order can vary. | — |
| Completion Dubai Municipality | Completion certificate that closes the permit; Emaar then closes its file. | — |
How it works
How it works in Emirates Hills
Tell us the idea
Villa number, photos and what you want to change.
We check and design
Approved plans or a survey, a site check, drawings and stamped calculations where needed.
We get it approved
Emaar NOC, then the Dubai Municipality permit where the works are structural.
Guides for works in Emirates Hills
What each work needs in Emirates Hills
- Extension: Emaar NOC, Dubai Municipality permit and stamped calculations
- Wall removal: structural check, Emaar NOC and Dubai Municipality permit
- Balcony closure: Emaar NOC and Dubai Municipality permit; it adds floor area
- Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
- Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
- External colour or façade: Emaar NOC
- Internal finishes only: usually no permit; check with Emaar first
Questions
Questions owners ask in Emirates Hills
How Much Bigger Can My Emirates Hills Villa Be?
Emirates Hills villas sit on large plots and many are custom-built, so there is no single extension percentage. What you can add depends on the plot, the setbacks, the existing floor area and the Emirates Hills guidelines, and Emaar Community Management reviews each design. We check your plot before designing.
What counts toward the allowance?
Any added enclosed floor area: garden rooms, maid rooms, closed balconies and roof rooms. Open pergolas usually don’t add floor area.
How is the existing area measured?
From the as-built plans and a site check.
Does a previous owner’s extension count?
Yes. Earlier approved extensions use part of the allowance; unapproved ones need approval first.
How are the fees charged?
Emaar charges an application fee plus a charge based on the added gross floor area (GFA), at AED 1,000 per sq ft up to 10%, with higher rates above 10% subject to Emaar Management approval. Emaar confirms the amount during the NOC application.
Last checked: October 2026. Official sources: Emaar · Dubai Municipality · DEWA