Emirates Hills · Emaar · Villa

Can I Open Up Walls Inside My Emirates Hills Villa?

Can I Open Up Walls Inside My Emirates Hills Villa? Often, yes, including the wall between living and dining or the kitchen, after a structural check. Load-bearing walls need a new beam, an Emaar NOC and a Dubai Municipality permit.

The short answer

Many owners want an open-plan living, dining and kitchen area. Some internal walls are partitions and can be removed with an Emaar NOC; others carry the floor or roof above and need a beam designed by an engineer, stamped calculations and a Dubai Municipality permit. We check which walls are load-bearing from the as-built plans and on site before anything is removed. If a column is in the way, it can sometimes be removed too, with an alternative structural design.

Developer NOCEmaar Community Portal
AuthorityDubai Municipality
PlansApproved plans, or a site survey
open up walls inside my Emirates Hills villa

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing floor area: measured from the approved plans and on site.
  • Unapproved works: older changes are surveyed and approved before new works.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in Emirates Hills
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Approved villa plans, if you have them

Who does what

The approval route in Emirates Hills

Emirates Hills is part of Emirates Living: Emaar first, then Dubai Municipality. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the approved plans or a site survey.—
Emaar NOC
Emaar Community Management
NOC through the Emaar Community Portal. Emaar reviews the design and confirms its fees.Emaar extension fees
Permit
Dubai Municipality
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Emaar and Dubai Municipality
Inspections during and after the works; the order can vary.—
Completion
Dubai Municipality
Completion certificate that closes the permit; Emaar then closes its file.—

How it works

How it works in Emirates Hills

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Approved plans or a survey, a site check, drawings and stamped calculations where needed.

We get it approved

Emaar NOC, then the Dubai Municipality permit where the works are structural.

What each work needs in Emirates Hills

  • Extension: Emaar NOC, Dubai Municipality permit and stamped calculations
  • Wall removal: structural check, Emaar NOC and Dubai Municipality permit
  • Balcony closure: Emaar NOC and Dubai Municipality permit; it adds floor area
  • Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
  • External colour or façade: Emaar NOC
  • Internal finishes only: usually no permit; check with Emaar first

Questions

Questions owners ask in Emirates Hills

Can I remove the wall between living and dining?

Often, yes. If it is load-bearing, a new beam carries the load, designed with stamped calculations.

How do I know if a wall is load-bearing?

From the as-built plans and a site check by an engineer. Don’t rely on knocking on the wall or guessing.

Can I open the kitchen to the living area?

Often, yes, with the same check and approvals.

What size beam do I need?

It depends on the span and the loads. An engineer calculates it; there is no standard size.

Can I remove a column too?

Sometimes, with an alternative structural design that carries the loads, plus the approvals. We study the structure first.

What approvals are needed?

An Emaar NOC, and a Dubai Municipality permit where structural walls change.

Last checked: October 2026. Official sources: Emaar · Dubai Municipality · DEWA

Related guides

Keep reading