Emirates Hills · Emaar · Villa

Emirates Hills As-Built Drawings: Original Plans or Site Survey

Emirates Hills as-built drawings: Emaar or the villa’s original consultant may hold the approved plans. Where they are missing or don’t match the villa, we survey on site and redraw them. Where plans are missing or out of date, we survey the villa and redraw them in PDF and CAD.

As-built drawings show the villa as it is built: layouts, dimensions, structure and any changes. You need them for extensions, approvals, sales and fixing unapproved works. Emaar or the villa’s original consultant may hold the approved plans. Where they are missing or don’t match the villa, we survey on site and redraw them. Where they are missing, incomplete or don’t match the villa, we survey on site and prepare new as-built drawings in PDF and CAD.

Developer NOCEmaar NOC
AuthorityDubai Municipality
PlansApproved plans, or a site survey
Lakeside villas in Emirates Hills, Dubai
Emirates Hills, Dubai
Emirates Hills As-Built Drawings: Original Plans or Site Survey

What we check first

  • Plot and setbacks: where an extension, pergola or pool can go on your plot.
  • Structure: walls, slabs, columns and foundations before any opening or new load.
  • Existing floor area: measured from the approved plans and on site.
  • Unapproved works: older changes are surveyed and approved before new works.

Documents you will need

  • Photos of the villa and the area you want to change
  • Villa and plot number in Emirates Hills
  • Title deed and owner ID
  • A sketch or short description of the idea
  • Approved villa plans, if you have them

Who does what

The approval route in Emirates Hills

Emirates Hills is part of Emirates Living: Emaar first, then Dubai Municipality. We confirm the exact route for your villa.

StepApproval routeGuides
Design
Structural Solutions
Site check, drawings and stamped structural calculations, using the approved plans or a site survey.—
Emaar NOC
Emaar Community Management
NOC. Emaar reviews the design and confirms its fees.Emaar extension fees
Permit
Dubai Municipality
Building permit for structural works and added floor area, submitted by an approved consultant.—
Inspections
Emaar and Dubai Municipality
Inspections during and after the works; the order can vary.—
Completion
Dubai Municipality
Completion certificate that closes the permit; Emaar then closes its file.—

How it works

How it works in Emirates Hills

Tell us the idea

Villa number, photos and what you want to change.

We check and design

Approved plans or a survey, a site check, drawings and stamped calculations where needed.

We get it approved

Emaar NOC, then the Dubai Municipality permit where the works are structural.

What each work needs in Emirates Hills

  • Extension: Emaar NOC, Dubai Municipality permit and stamped calculations
  • Wall removal: structural check, Emaar NOC and Dubai Municipality permit
  • Balcony closure: Emaar NOC and Dubai Municipality permit; it adds floor area
  • Pergola or car shade: Emaar NOC, stamped calculations and a steel contractor stamp for steel
  • Pool: Emaar NOC, Dubai Municipality permit and the DM environmental NOC
  • External colour or façade: Emaar NOC
  • Internal finishes only: usually no permit; check with Emaar first
Emirates Hills As-Built Drawings: Original Plans or Site Survey

Questions

Questions owners ask in Emirates Hills

Where do I get the original plans?

Emaar or the villa’s original consultant may hold the approved plans. Where they are missing or don’t match the villa, we survey on site and redraw them.

What if the plans don’t match my villa?

We survey the villa and redraw the as-built drawings to match.

What formats do you provide?

PDF and CAD.

Why do I need as-built drawings?

For extension designs, approvals, a sale, and fixing earlier unapproved works.

Do you visit the villa?

Yes, for a survey where drawings are missing or out of date.

Last checked: October 2026. Official sources: Emaar · Dubai Municipality · DEWA

Related guides

Keep reading