Is my villa safe to extend upwards?

Only an assessment can tell. The existing columns, foundations and slabs must carry the new floor, and the community rules must allow it.

Only a structural assessment can tell. An extra floor adds load to the existing slabs, columns and foundations, so the engineer checks whether they can carry it or need strengthening, and the community guidelines must allow the extra height and floor area. Where new foundations are needed, a soil test is required. Structural Solutions assesses the villa, designs the extension and handles the NOC and permit.

CheckColumns, foundations, slabs
RulesCommunity height and GFA
New foundationsNeed a soil test

What you need to know

  • Existing structure: Must carry the new floor or be strengthened.
  • Guidelines: The community must allow the extra floor.
  • Soil test: Required wherever a new substructure is built.
  • Approvals: Developer NOC and building permit.

Documents you may need

  • Title deed and owner ID
  • Affection plan or site plan
  • Existing drawings or as-built drawings
  • Photos of the area
  • Developer NOC (where the community has a developer)

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Site visit
Structural Solutions
We inspect the structure, the cracks, the loads and any changes made.—
Checks and calculations
Structural Solutions
We check the structure against the loads and the codes.Structural calculations
Stamped report
Structural Solutions
Findings and recommendations in a stamped report.Structural reports
Repairs
A contractor
Repairs are carried out by a contractor, following the report.—
Approvals
Developer and authority
Where repairs or changes need a NOC or permit, we apply.Approvals

Questions

Related questions

Can every villa take an extra floor?

No. It depends on the structure and the community rules.

Do I need new foundations?

Sometimes. Then a soil test is required.

Does it add GFA?

Yes.

Who designs it?

Our engineers, with stamped calculations.