Dubai Silicon Oasis · Cedre Villas

Cedre Villas modifications: who approves them?

Villa modifications in Cedre Villas, Dubai Silicon Oasis, are approved by the DSO Authority, submitted through an approved consultant.

Villa modifications in Cedre Villas, in Dubai Silicon Oasis, are approved by the DSO Authority, part of DIEZ, and the application is submitted through an approved consultant, with drawings and stamped calculations where the works are structural. There is no master developer NOC in DSO. Structural Solutions prepares the drawings and calculations, submits as approved consultant, and handles inspection and completion.

Approved byDSO Authority (DIEZ)
Submitted byAn approved consultant
Developer NOCNot needed

What you need to know

  • Extensions: Need drawings and stamped calculations.
  • Soil test: Wherever new foundations are built.
  • DCD: Where fire safety changes.
  • Completion: Inspection and certificate.

Documents you may need

  • Title deed and owner ID
  • Affection plan or site plan
  • Existing or as-built drawings
  • Photos of the villa

Who does what

Step by step

We confirm the route for your unit.

StepApproval routeGuides
Drawings and calculations
Structural Solutions
Architectural drawings and stamped calculations.Calculations
DSO Authority
Approved consultant → DSOA (DIEZ)
Approval of the villa modification.DSO approvals
DCD (where needed)
Structural Solutions → DCD
Where fire safety changes.—
Inspection and completion
DSO Authority
Final inspection and completion certificate.Request sign-off online

Questions

Related questions

Do I need a developer NOC in Cedre Villas?

No. The DSO Authority approves the works.

Can I apply myself?

Submissions are made through an approved consultant.

Do extensions need calculations?

Yes, stamped structural calculations.

Can you get my villa drawings?

Yes, we can obtain or prepare them.

Related guides

Keep reading