What Will Nakheel Ask For Before Approving My Renovation?
Nakheel wants to know who owns the villa, what is there today and exactly what you want to change: the title deed, owner ID, photos, the villa plans and drawings of the new works, submitted through the Nakheel online portal.
The Usual Documents
Title deed, owner ID, photos, the existing villa plans and drawings of the change. Structural works also need calculations from an engineer.
What you need to know
- After the Nakheel NOC: Structural works go to Trakhees for the building permit. Pools also need the DM Environment Department NOC.
- Villa plans: Nakheel provides villa plans to owners; if they are missing, the villa is surveyed and drawn as built.
- Approved consultant: Submissions to Trakhees are made by an approved consultant, not by the owner.
- VSR: Unapproved works show up in the Villa Status Report (VSR) and need fixing before a sale.
Documents you will need
- Title deed and owner Emirates ID or passport
- Villa plans from Nakheel, or as-built drawings
- Proposed drawings
- Stamped structural calculations for structural works
- Photos of the area
At a glance
What Will Nakheel Ask For Before Approving My Renovation? at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| You and our engineers Step 1 | Your idea, photos and plot details. We get the villa plans from Nakheel and check them against what is built. | — |
| Nakheel (online portal) Step 2 | Reviews the design against its community rules and issues the NOC. | — |
| Trakhees Step 3 | Building permit for structural works. | — |
| Nakheel and Trakhees Step 4 | Inspections and completion. | — |
How it works
How It Works in Nakheel Communities
Your Idea, Photos and Plot Details
Villa Plans From Nakheel
Sketch and Early Check
Drawings and Structural Calculations
Nakheel NOC via the Nakheel online portal
Trakhees Permit, Works and Completion
Who does what
Three parties, one route
Trakhees
Issues the building permit for structural works and inspects at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.
Talk to our engineers →What Nakheel Owners Ask Us About
- Extension
- Pool
- Pergola
- Wall Removal
- Lift
- Facade Change
Why applications come back
- Drawings that do not match the villa as it stands
- AutoCAD in DLTM coordinates not supplied where asked
- No stamped structural calculations
- Unapproved works already on the VSR
- Missing owner documents
Questions
Questions owners ask
What documents does Nakheel need for a renovation NOC?
Title deed, owner ID, photos, villa plans and drawings of the works.
Who approves changes to my Nakheel villa?
Nakheel issues the NOC through the Nakheel online portal, then Trakhees issues the building permit for structural works.
Do I need full drawings to ask if my idea is possible?
No. Photos and a simple sketch are enough for us to give you an early answer.
Can I get the plans of my villa?
Yes. Nakheel can provide the villa plans. Check them against what is built before design starts.
Related guides
