Hills Grove Villa Extension NOC (Dubai Hills)
Can I Extend My Hills Grove Villa in Dubai Hills? Adding space is possible, but every case is reviewed.
Can I Extend My Hills Grove Villa in Dubai Hills?
Often yes, with the Emaar NOC and a DDA permit. There is no single extension figure in Dubai Hills: Emaar reviews each case against the guidelines for your villa, the plot and the setbacks. Emaar charges on the added GFA: AED 1,000 per sq ft up to 10%, AED 3,000 per sq ft from 10% to 20% and AED 6,000 per sq ft above 20%, everything above 10% subject to Emaar Management approval. Townhouses pay a flat AED 1,000 per sq ft. We measure your villa from the Emaar as-built plans and check the plot before design.

Official sources: Emaar · Dubai Development Authority (DDA)
What we check first
- Plot: Setbacks
- Villa: Type and plans
- Area: Added GFA
- Structure: Walls and foundations
- Look: Matches the villa
- Fees: Emaar GFA rates
Documents you will need
- Villa and plot number in Hills Grove
- Title deed and owner ID
- Photos of the villa and the area
- A sketch or short description of the idea
- Emaar as-built plans, if you have them
Route
The approval route in Hills Grove
Emaar first, then DDA. We confirm the route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Early check Our engineers | Your idea, photos and plot. We get the as-built plans from Emaar and check them on site. | As-built drawings |
| Drawings Structural Solutions | Drawings and stamped structural calculations. | Structural calculations |
| Emaar NOC Emaar | Reviews the design against the Dubai Hills guidelines and issues the NOC. | Dubai Hills NOC guide |
| DDA permit Dubai Development Authority | Building permit for structural works. | DDA permit |
| Works Your contractor | Built to the approved drawings. | — |
| Completion Emaar and DDA | Inspections, Emaar clearance and the DDA completion certificate. | Completion certificate |
How it works
How it works
1. Send us the idea
Villa number, photos and what you want.
2. Villa plans
From Emaar, checked on site.
3. Early check
Guidelines, area and structure.
4. Drawings
Drawings and calculations.
5. Emaar NOC
We apply for you.
6. DDA permit
Then works and completion.
Related questions
What causes problems
- Designing before checking the plot
- Assuming above 10% is automatic
- Older unapproved works
Villa in Hills Grove?
Check your idea first
Send us three things on WhatsApp:
- Villa number
- Photos of the area
- What you want to do
We check the Emaar rules and the structure, then handle the Emaar NOC and the DDA permit.
Emaar rates in Dubai Hills
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Questions
Questions
Can I Extend My Hills Grove Villa in Dubai Hills?
Often yes, with the Emaar NOC and a DDA permit. There is no single extension figure in Dubai Hills: Emaar reviews each case against the guidelines for your villa, the plot and the setbacks. Emaar charges on the added GFA: AED 1,000 per sq ft up to 10%, AED 3,000 per sq ft from 10% to 20% and AED 6,000 per sq ft above 20%, everything above 10% subject to Emaar Management approval. Townhouses pay a flat AED 1,000 per sq ft. We measure your villa from the Emaar as-built plans and check the plot before design.
How much can I add?
It depends on your villa and plot. Emaar reviews each case.
What does Emaar charge?
AED 1,000 per sq ft up to 10%; higher bands subject to Emaar Management approval.
What if there are older works?
Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
