Dubai Hills Garden Works NOC: Sheds, Decks and Shade
Dubai Hills garden works, such as a covered terrace, shed, pool deck or pergola, need an Emaar NOC. Anything fixed with a foundation or roof also needs a DDA permit.
Garden works in Dubai Hills need an Emaar NOC, and anything with a fixed foundation or roof also needs a DDA building permit. Sheds should be lightweight and at most 3 m x 3 m, paving up to 0.3 m high, and planters up to 0.6 m, subject to Emaar’s review. BBQs and open showers belong in the backyard and below the boundary wall height. Trees stay at least 1.5 m from boundary walls, and common areas cannot be used.
Emaar’s rules
Garden and landscaping rules
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Paving and decking | Inside the plot, up to 0.3 m high. |
| Planters | Up to 0.6 m high, on the inner side of the boundary wall. |
| BBQ, wall features, open showers | Backyard only, below the boundary wall height, on their own wall. |
| Trees | At least 1.5 m from boundary walls. |
| Common areas | No planting, paving or lighting on footpaths and road verges. |
Emaar’s rules
Pool house, store room and garden shed rules
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Pool house | In the back garden within the setbacks, or against the shared boundary wall with a neighbour NOC. The size is reviewed by Emaar. |
| Shed materials | Lightweight only: wood, aluminium or PVC, in the villa’s colour. |
| Shed size | At most 3 m x 3 m, and no higher than the boundary wall. |
| Shed location | Within the building lines, without using the boundary walls. |
| Wet areas | No toilets or wet areas in a store room or shed. |
| Pump rooms | No taller than the boundary wall. In the front yard they must be underground. |
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Covered terraces: If enclosed, they add GFA.
- Boundary walls: Shades cannot be fixed to them.
- Common areas: No planting, paving or lights on footpaths and verges.
- Wet areas: No toilets in a shed.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Questions
Questions owners ask
Do I need a NOC for garden works?
Emaar needs to approve garden structures. Soft landscaping is simpler, so tell us what you plan.
How big can a shed be?
At most 3 m x 3 m, and no higher than the boundary wall.
Do I need a DDA permit?
For anything with a fixed foundation or roof.
Can I plant on the verge?
No, common areas cannot be used.