Dubai Hills · Emaar

Can I Build a Garden Room in Dubai Hills?

It depends on what it is for. A small shed follows clear rules, a pool house or a room with a bathroom needs Emaar’s review, and it adds GFA.

The short answer

It depends on the room. A store or shed is lightweight, at most 3 m x 3 m, no higher than the boundary wall, and has no toilet. A pool house goes in the back garden within the setbacks, and Emaar reviews its size. A maid room usually goes in the side alley. A proper room in the garden is treated as added GFA, and it needs an Emaar NOC and a DDA permit. Tell us what the room is for, and we will advise on your case.

ShedAt most 3 m x 3 m
Pool houseReviewed by Emaar
RoomAdds GFA

Emaar’s rules

Pool house, store room and garden shed rules

Emaar reviews every application, so these are subject to its review.

ItemWhat to expect
Pool houseIn the back garden within the setbacks, or against the shared boundary wall with a neighbour NOC. The size is reviewed by Emaar.
Shed materialsLightweight only: wood, aluminium or PVC, in the villa’s colour.
Shed sizeAt most 3 m x 3 m, and no higher than the boundary wall.
Shed locationWithin the building lines, without using the boundary walls.
Wet areasNo toilets or wet areas in a store room or shed.
Pump roomsNo taller than the boundary wall. In the front yard they must be underground.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Home office: Tell us the use, and we advise on the route.
  • Wet areas: No toilets in a store or shed.
  • Materials: Sheds are wood, aluminium or PVC.
  • Location: Within the building lines.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Dubai Hills

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

What is an Emaar NOC? →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.

Is Dubai Hills under DDA? →
📐

Structural Solutions

Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.

Dubai Hills approval guide →

Why applications come back

  • Design does not follow Emaar’s rules
  • Materials or colours do not match the villa
  • Drawings or Building Completion Certificate missing
  • Works started before the NOC

Emaar GFA rates

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions owners ask

Can I build a home office in the garden?

It depends on your plot and Emaar’s review. Ask us.

Do I need a permit for a shed?

Emaar’s rules apply. Tell us the size and materials.

Can a shed have a toilet?

No.

Does a pool house add GFA?

Yes, and Emaar reviews its size.

Related guides

Keep reading