As-Built Drawings for the Completion Certificate (BCC) in Dubai

At completion the authority compares the site with the drawings. If anything changed during construction, or the as-built set is missing or rejected, the completion certificate waits. We survey what was built and prepare the as-built drawings.

As-built drawings show the works exactly as built, with any change from the approved drawings marked. The developer and the authority (DM, DDA or Trakhees) use them at the final inspection for the completion certificate (BCC). If walls, openings, the pool or other items were changed on site, the drawings must show it. We survey the property, prepare the as-built set and handle the comments. The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.

Prepared fromOur site survey
Used atFinal inspection
FormatPDF, and CAD

Why they matter

Changes on site that the as-built drawings must show

Small changes during construction are the most common reason a completion file comes back.

Change on siteWhat the drawings show
Wall moved or removedThe new wall layout and any beam or support added
Window or door resizedNew opening sizes on plans and elevations
Plant room or AC units movedThe new position and access
Pool shape or position changedThe pool as built, with levels
Pergola or canopy size changedSize, height and position as built
Extra area addedShown clearly, and checked first; see Works don’t match the approved drawings

Problems

As-built drawings missing or rejected: what to do

ProblemWhat we do
Contractor never prepared themWe survey the property and prepare the set
Drawings do not match the siteWe re-survey and correct them
Approved drawings missingWe request the existing approved drawings, or survey and redraw
Comments from the authorityWe answer each comment and resubmit; see BCC rejected: common reasons
Contractor holding the filesSee Contractor holding the documents

Related

Related drawing and completion guides

TopicGuide
As-built surveyas-built survey
As-built approval for works done without a permitas-built approval
Owner letterowner letter
Full completion guideCompletion certificate (BCC) guide

Official sites: Dubai Municipality | DDA | Trakhees

What you need to know

  • Survey based: prepared from our own site survey.
  • Changes marked: anything different from the approval is shown.
  • Authority format: DM, DDA or Trakhees.
  • Structure: structural changes are checked by our engineers.

Documents you will need

  • Approved permit drawings, if available
  • Permit number
  • Title deed and owner ID
  • Signed authorisation letter
  • Access to the property

How it works

How we prepare as-built drawings for completion

1. Documents

What you have.

2. Survey

Measured on site.

3. Compare

Against the approval.

4. Draft

As-built set.

5. Review

Our engineers check.

6. Submit

With the completion file.

Already done

Works built without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Questions

As-built drawings for completion: questions

What are as-built drawings for the completion certificate?

Drawings of the works exactly as built, used by the developer and the authority at the final inspection.

Why was my completion certificate held for as-built drawings?

Usually because the site differs from the approved drawings or the as-built set was missing or incomplete.

Can you prepare as-built drawings without the original drawings?

Yes. We request the existing approved drawings or survey the property and redraw it.

Do you provide CAD files?

We provide PDF, and CAD where available.

Is the completion certificate the same as the BCC?

The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.

How much does it cost?

It depends on the drawings and the scope. We review the file and advise.

Who can help?

Structural Solutions takes over stuck completion files. We audit the file, survey the works, prepare the as-built drawings and the owner letter pack, coordinate any contractor change and follow the developer and authority inspections until the completion certificate (BCC) is issued. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.