As-Built Drawings for the Completion Certificate (BCC) in Dubai
At completion the authority compares the site with the drawings. If anything changed during construction, or the as-built set is missing or rejected, the completion certificate waits. We survey what was built and prepare the as-built drawings.
As-built drawings show the works exactly as built, with any change from the approved drawings marked. The developer and the authority (DM, DDA or Trakhees) use them at the final inspection for the completion certificate (BCC). If walls, openings, the pool or other items were changed on site, the drawings must show it. We survey the property, prepare the as-built set and handle the comments. The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.
Why they matter
Changes on site that the as-built drawings must show
Small changes during construction are the most common reason a completion file comes back.
| Change on site | What the drawings show |
|---|---|
| Wall moved or removed | The new wall layout and any beam or support added |
| Window or door resized | New opening sizes on plans and elevations |
| Plant room or AC units moved | The new position and access |
| Pool shape or position changed | The pool as built, with levels |
| Pergola or canopy size changed | Size, height and position as built |
| Extra area added | Shown clearly, and checked first; see Works don’t match the approved drawings |
Problems
As-built drawings missing or rejected: what to do
| Problem | What we do |
|---|---|
| Contractor never prepared them | We survey the property and prepare the set |
| Drawings do not match the site | We re-survey and correct them |
| Approved drawings missing | We request the existing approved drawings, or survey and redraw |
| Comments from the authority | We answer each comment and resubmit; see BCC rejected: common reasons |
| Contractor holding the files | See Contractor holding the documents |
Related
Related drawing and completion guides
| Topic | Guide |
|---|---|
| As-built survey | as-built survey |
| As-built approval for works done without a permit | as-built approval |
| Owner letter | owner letter |
| Full completion guide | Completion certificate (BCC) guide |
Official sites: Dubai Municipality | DDA | Trakhees
What you need to know
- Survey based: prepared from our own site survey.
- Changes marked: anything different from the approval is shown.
- Authority format: DM, DDA or Trakhees.
- Structure: structural changes are checked by our engineers.
Documents you will need
- Approved permit drawings, if available
- Permit number
- Title deed and owner ID
- Signed authorisation letter
- Access to the property
How it works
How we prepare as-built drawings for completion
1. Documents
What you have.
2. Survey
Measured on site.
3. Compare
Against the approval.
4. Draft
As-built set.
5. Review
Our engineers check.
6. Submit
With the completion file.
Already done
Works built without approval?
Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
As-built drawings for completion: questions
What are as-built drawings for the completion certificate?
Drawings of the works exactly as built, used by the developer and the authority at the final inspection.
Why was my completion certificate held for as-built drawings?
Usually because the site differs from the approved drawings or the as-built set was missing or incomplete.
Can you prepare as-built drawings without the original drawings?
Yes. We request the existing approved drawings or survey the property and redraw it.
Do you provide CAD files?
We provide PDF, and CAD where available.
Is the completion certificate the same as the BCC?
The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.
How much does it cost?
It depends on the drawings and the scope. We review the file and advise.
Who can help?
Structural Solutions takes over stuck completion files. We audit the file, survey the works, prepare the as-built drawings and the owner letter pack, coordinate any contractor change and follow the developer and authority inspections until the completion certificate (BCC) is issued. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.