As-Built Drawings for Completion Certificate Dubai
If the works on site differ from the approved drawings, the completion certificate can be held up until the drawings are updated. We survey what was built and prepare as-built drawings for the completion stage.
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Arabian Ranches
Palm Jumeirah
Dubai Hills Estate
The Meadows
The Springs
Jumeirah Islands
Emirates Hills
Mudon
The Villa
Streamlined
Approval process
End-to-end
NOC to permit, managed
Direct access
To your project team
Always on
Client support
Why Completion Needs Matching Drawings
At completion, the authority checks that the works match what was approved. Changes made during construction — a moved wall, a resized opening, a relocated plant room — need to be shown on updated drawings.
How We Prepare Your Drawings
01
Site Visit & Measured Survey
02
Existing Documents Reviewed
03
AutoCAD Drafting
04
Engineer Review
05
Stamped Drawings Issued
06
Submission Support
How Our Approval Process Works
Our expert engineers handle the entire NOC process, ensuring faster approvals and full compliance with Dubai regulations.
Working With Your Contractor
Common Projects We Handle
Extension Completion
Pool Completion
Fit-Out Completion
Warehouse Completion
Changes Made on Site
Delayed Completion Certificate
As-Built Drawings for Completion Certificate Dubai at a Glance
| Step | Who | What happens |
|---|---|---|
| 1 | Structural engineer | Surveys the site and prepares drawings to the format of the developer and the authority. |
| 2 | Master developer (where the community has one) | Issues the community NOC against its design guidelines. |
| 3 | Building authority — Dubai Municipality, DDA or Trakhees — depending on the community | Building permit; work starts only after it is issued. |
| 4 | Developer and authority | Completion inspection and sign-off. |
Documents Required
- Title deed (or tenancy contract plus landlord NOC for tenants)
- Owner passport and Emirates ID copy
- Affection plan / site plan
- Any existing drawings (PDF or CAD)
- Access to the site for the survey
Key Technical Rules
- Survey-based: drawings are prepared from our own site survey, not traced from old PDFs.
- Authority format: prepared to the submission format of DM, DDA or Trakhees as required.
- DLTM where required: developers and authorities ask for AutoCAD in DLTM coordinates for works near or outside the plot limit.
- Existing and proposed: both sets are shown so reviewers can see the change.
- PDF and DWG: issued in both formats for submission.
Site Survey
Our own team
Authority Format
DM, DDA, Trakhees
PDF + DWG
Ready to submit
Why Owners Choose Structural Solutions for Drawings
Measured On Site
Our team surveys the property in person, so the drawings show what is actually built.
Authority-Ready Formats
Drawings prepared in AutoCAD to the format the reviewing authority or developer expects — DM, DDA, Trakhees or developer requirements.
Engineer Reviewed & Stamped
Every set is reviewed by our engineers and can be stamped for submission.
Get Your Drawings Prepared
Tell us about your property and what the drawings are for — we will survey, draft and deliver drawings ready for submission.
As-Built Drawings for Completion Certificate Dubai — FAQs
Do I need as-built drawings for a completion certificate?
When the works differ from the approved drawings, updated as-built drawings are needed.
What causes differences?
Changes made during construction.
Who prepares them?
An engineering consultant like us, after surveying the works.
Can this delay completion?
Yes, until the drawings match the works.
Can you help?
Yes.