Can I Build a Maid Room in My Dubai Hills Garden?
Usually in the side alley, not in front of the villa, as an independent structure. It needs an Emaar NOC and a DDA permit.
The short answer
A maid room usually goes in the side alley of your Dubai Hills plot, 3 m from the villa or as the affection plan allows, not in front of the villa, and without using the shared boundary wall. It needs to be at least 6.5 m² and 2.13 m wide, plus a bathroom. It adds GFA, and it needs an Emaar NOC and a DDA permit, subject to Emaar’s review of your plot. On townhouses, it is only possible on end and corner units.
Emaar’s rules
Maid room and driver room rules in Dubai Hills
Emaar reviews every application, so these are subject to its review.
| Item | What to expect |
|---|---|
| Where | Inside the plot, in the side alley. Not in front of the building. |
| Offset | 3 m from the villa, or as the affection plan allows. |
| Boundary wall | Must not use the shared boundary wall: the room is an independent structure. |
| Room size | At least 6.5 m² and 2.13 m wide, with a ceiling of at least 2.7 m. |
| Bathroom | At least 2.79 m² and 1.22 m wide. |
| Openings | Door and window match the villa. Windows and the bathroom exhaust face inside the villa. |
| Foundations | Must not disturb the villa or boundary wall foundations. |
| AC | Villas: no AC on the room’s roof, and units hidden from neighbours and the street. Townhouses: on the roof only, hidden by a parapet or louvres. |
| Townhouses | End and corner units only. Not allowed on middle units. |
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Small plots: Side alleys can be narrow, so we measure yours.
- Windows: Door and windows match the villa.
- Services: Drainage connections are part of the design.
- Back garden: Tell us if your side alley does not work.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Dubai Hills
Dubai Development Authority (DDA)
Issues the building permit for structural works in Dubai Hills Estate, after the Emaar NOC.
Is Dubai Hills under DDA? →Structural Solutions
Checks your idea, prepares drawings and stamped calculations, and handles the NOC and permit.
Dubai Hills approval guide →Why applications come back
- Design does not follow Emaar’s rules
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Questions
Questions owners ask
Can it go in the back garden?
The usual location is the side alley. We check your plot.
Can it use the boundary wall?
Not a shared wall: it must stand on its own.
Does it add GFA?
Yes.
Can a townhouse have one?
End and corner units only.