As-Built Drawings for an Emaar NOC
Emaar reviews your NOC against your villa’s plans. If they are missing or out of date, we fix that first.
Emaar provides the as-built plans for most of its villas, and the NOC drawings are based on them. When the plans are missing, or the villa has changed since handover, we survey the villa and prepare new as-built drawings so the NOC is based on what is actually there. We prepare them in the format the next authority needs: Dubai Municipality in Emirates Living, DDA in Dubai Hills, Arabian Ranches and The Valley.

Official sources: Dubai Municipality · DDA
What we check
- Plans: From Emaar
- Changes: Since handover
- Survey: If needed
- Format: DM or DDA
- Area: GFA measured
- Files: PDF and CAD
Documents you will need
- Title deed or tenancy contract
- Owner or tenant ID
- Existing drawings, if available
- Photos and a short description
Route
From Emaar plans to NOC
The general route. We confirm it for your project.
| Step | Approval route | Guides |
|---|---|---|
| Request Structural Solutions | Plans from Emaar on your behalf. | — |
| Compare Our engineers | Plans against the villa. | — |
| Survey Our engineers | Where plans are missing or out of date. | As-built survey |
| Drawings Structural Solutions | As-built set in the right format. | — |
| Emaar NOC Emaar | Submitted with your proposed works. | — |
| Permit DM or DDA | By community. | — |
How it works
How we work
1. Send us the details
Property, area and what you need.
2. Check
Route and documents confirmed.
3. Site
Visit or survey if needed.
4. Design
Drawings and calculations by our engineers.
5. Submission
By us.
6. Follow-up
Comments until approval.
What causes problems
- Designing from outdated plans
- Unapproved changes not shown
- Wrong authority format
Need help with this?
Get your route confirmed
Send us three things on WhatsApp:
- Property and area
- What you want to do
- Any drawings you have
Our engineers confirm the route, prepare the drawings and handle the submissions.
Questions
Questions
Does Emaar give the plans?
Yes, for most villas; we request them for you.
What if the villa was changed?
We survey it; older unapproved changes may need the as-built route.
Which format?
Dubai Municipality in Emirates Living, DDA in Dubai Hills, Arabian Ranches and The Valley.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
