Arabian Ranches · Drawings

As-Built Drawings in Arabian Ranches: Get Them or Have Them Redrawn

As-built drawings in Arabian Ranches come from Emaar. If they are missing or do not match the villa, we survey the villa and redraw them, in PDF and CAD.

Emaar provides the as-built plans to Arabian Ranches owners. We use them to confirm your GFA and find the structural walls before any design. If the plans are missing, or earlier changes mean they no longer match the villa, we survey the villa on site and redraw them in PDF and CAD. This applies to Arabian Ranches 1, 2 and 3. Accurate drawings matter because Emaar’s NOC needs existing and proposed drawings and elevations.

SourceEmaar provides the plans
Missing or outdatedWe survey and redraw
FormatsPDF and CAD

Emaar’s guide

Emaar’s document checklist for a villa or townhouse NOC

From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.

ItemWhat the guide says
DrawingsDetailed architectural drawings, existing and proposed.
ElevationsExisting and proposed.
ScopeA detailed scope of works.
PhotosExternal photos for external changes such as paint, garage door, gate or fence.
LicenceCopy of the contractor or consultant licence.
3DA coloured 3D concept drawing.
Affection planFor independent villas.
Completion certificateThe villa’s Building Completion Certificate, for all requests except soft landscaping.

Official sites: Emaar · Dubai Development Authority (DDA)

What you need to know

  • Why you need them: To measure the existing GFA and to check the structure.
  • Earlier changes: We compare the plans with the villa on site.
  • Buying a villa: Plans help you check earlier changes before you buy.
  • Emaar’s checklist: Asks for existing and proposed drawings and elevations.

Documents you will need

  • Title deed and owner ID
  • Architectural drawings and elevations, existing and proposed
  • Detailed scope of works
  • Photos of the villa
  • Contractor or consultant licence
  • Coloured 3D concept
  • Affection plan (independent villas)
  • Building Completion Certificate

How it works

From idea to approval

1. Check

We check your idea against Emaar’s guide and your villa’s plans.

2. Drawings

Drawings and stamped calculations, using the as-built plans Emaar provides.

3. Emaar NOC

We apply for you.

4. DDA permit

The building permit for structural works.

5. Works

Built as approved, with contractor entry permits.

6. Completion

Final inspections and the completion certificate.

Who does what

Who approves works in Arabian Ranches

🏘️

Emaar

Reviews the design, issues the NOC and confirms its fees.

Emaar villa extension NOC →
🏛️

Dubai Development Authority (DDA)

Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.

Is Arabian Ranches under DDA? →
📐

Structural Solutions

Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.

Arabian Ranches approval guide →

Why applications come back

  • Existing drawings do not match the villa
  • Unapproved changes not shown
  • Elevations missing
  • Building Completion Certificate missing

Questions

Questions owners ask

How do I get as-built drawings in Arabian Ranches?

Emaar provides them to owners. If they are missing or outdated, we survey the villa and redraw them.

Do the plans show earlier changes?

Not always, so we compare them with the villa on site.

What format do you provide?

PDF and CAD.

Do you cover Arabian Ranches 2 and 3?

Yes, all three.