Arabian Ranches Townhouse Extension Rules: What Emaar Allows
An Arabian Ranches townhouse extension depends on the unit and plot, and Emaar reviews each case. Send us your unit type and idea and we will advise.
It depends on your unit, your plot and Emaar’s review, so each case is different. A neighbour NOC may be needed. Send us your unit type and idea, and we will advise on your case. Extra service rooms are only possible on end and corner units, not middle units. Emaar charges AED 1,000 per sq ft of added GFA, subject to Emaar review. After the Emaar NOC, structural works need a DDA building permit.
Emaar’s guide
Arabian Ranches townhouse modification rules
From Emaar’s Arabian Ranches Modification Guidelines. Emaar reviews every application.
| Item | What the guide says |
|---|---|
| Extension | Depends on the unit and plot. Emaar reviews each case, and a neighbour NOC may be needed. Ask us and we will advise. |
| Front and side | Ask us: Emaar reviews each case. |
| Service block | End and corner units only, in the side alley, not on the shared wall. Not allowed on middle units. |
| Look | Same finishes, materials, sills and lintel levels. The elevation does not change. |
| Patio and main door | Enclosing the patio or moving the door onto an existing slab is reviewed as added area. |
| Carport | Stays parking. No roll-up doors and no extra parking. |
| Cat ladders | Not allowed. |
| Rate | AED 1,000 per sq ft of added GFA, subject to Emaar review. |
Emaar GFA rates
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates are subject to Emaar’s review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Official sites: Emaar · Dubai Development Authority (DDA)
What you need to know
- Middle units: No service block; a rear extension only, with a neighbour NOC.
- End and corner units: A service block is possible in the side alley, not on the shared wall.
- Shared walls: Your neighbours’ NOC is part of the application.
- Same look: Finishes, sills and lintel levels match; the elevation does not change.
- No higher bands: Townhouses do not have the villa bands above 10%.
Documents you will need
- Title deed and owner ID
- Architectural drawings and elevations, existing and proposed
- Detailed scope of works
- Photos of the villa
- Contractor or consultant licence
- Coloured 3D concept
- Affection plan (independent villas)
- Building Completion Certificate
How it works
From idea to approval
1. Check
We check your idea against Emaar’s guide and your villa’s plans.
2. Drawings
Drawings and stamped calculations, using the as-built plans Emaar provides.
3. Emaar NOC
We apply for you.
4. DDA permit
The building permit for structural works.
5. Works
Built as approved, with contractor entry permits.
6. Completion
Final inspections and the completion certificate.
Who does what
Who approves works in Arabian Ranches
Dubai Development Authority (DDA)
Issues the building permit for structural works in Arabian Ranches 1, 2 and 3, after the Emaar NOC.
Is Arabian Ranches under DDA? →Structural Solutions
Checks the idea against the guide, prepares drawings and stamped calculations, and handles the NOC and permit.
Arabian Ranches approval guide →Why applications come back
- Design does not follow Emaar’s guide
- Materials or colours do not match the villa
- Drawings or Building Completion Certificate missing
- Works started before the NOC
Questions
Questions owners ask
Can I extend my Arabian Ranches townhouse?
It depends on the unit, subject to Emaar review. Ask us and we will advise.
Can I build a maid room on a middle townhouse?
No, service blocks are only allowed on end and corner units.
Can I extend the front or side?
Ask us: Emaar reviews each case.
How much does Emaar charge for a townhouse extension?
AED 1,000 per sq ft of added GFA, subject to Emaar review.
Who issues the permit?
DDA, after the Emaar NOC.
Can I add a cat ladder?
No, cat ladders are not allowed on townhouses.