Nakheel · Al Furjan

Al Furjan Kitchen Extension

Extending the kitchen of an Al Furjan villa within the existing villa footprint — for example into an adjoining room — needs a Nakheel Home Modification NOC followed by a Trakhees CED building permit. We design the extension and the openings into the existing villa.

Kitchen Extensions in Al Furjan

Kitchen extensions stay within the existing villa footprint and usually open into the existing living or dining area, so the wall openings need engineering.

1. Nakheel NOCAED 5,250, or 15,750 with a pool
2. Structural designOpenings and new loads
3. Trakhees permitAbout AED 1,500 to 3,000

What you need to know

  • Services and Drainage: New kitchens need water, drainage and power routed correctly. We coordinate these with the architectural and structural drawings.
  • Within the footprint: the kitchen grows into an existing room or covered area of the villa, or upwards. Extensions out into the garden are not allowed in Al Furjan.
  • Nakheel NOC first: AED 5,250, or AED 15,750 if the works include a pool. Nakheel takes no deposit. If enclosing a covered area adds built-up area, Nakheel charges about AED 1,400 per sq ft.
  • Trakhees permit: about AED 1,500 to 3,000, plus a refundable AED 2,500 deposit, after the Nakheel NOC.
  • Structural check: new openings in walls need a beam or lintel designed and stamped by our engineers.
  • Completion inspection: Nakheel and Trakhees inspect when the works are finished.

Documents you will need

  • Title deed
  • Owner passport and Emirates ID copy
  • Affection plan / site plan
  • Existing villa drawings, or as-built drawings if the plans are missing
  • Proposed kitchen layout drawings
  • Structural calculations where loads or openings change

At a glance

Al Furjan Kitchen Extension at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Prepares the kitchen layout drawings, structural checks and stamped calculations where needed.—
Nakheel
Step 2
Issues the NOC for the works (AED 5,250, or AED 15,750 with a pool).—
Authority — Trakhees
Step 3
Reviews the drawings and issues the permit (about AED 1,500 to 3,000, plus an AED 2,500 deposit).—
Nakheel and Trakhees
Step 4
Completion inspection.—

How it works

How We Get Your Extension Approved

Footprint Check

We check the kitchen stays within the existing villa footprint.

Villa Type Guidelines Confirmed

We check the rules for your villa type.

Trakhees-Format Drawings

Our engineers prepare the drawings and stamped calculations.

Nakheel Home Modification NOC

We submit to Nakheel. NOC fee AED 5,250.

Trakhees CED Building Permit

We submit to Trakhees for the building permit.

Construction & Sign-Off

The works are built, then inspected for sign-off.

Who does what

Three parties, one route

🏘️

Nakheel

Master developer of Al Furjan. Issues the NOC; we apply as your consultant.

Nakheel approvals →
🏛️

Trakhees

Issues the building permit for structural works and inspects at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits to Nakheel and Trakhees for you.

Talk to our engineers →

Common Projects in Al Furjan

  • Kitchen Into an Adjoining Room
  • Open-Plan Kitchen
  • Dirty Kitchen in an Existing Room
  • Kitchen + Dining Extension
  • Outdoor Kitchen
  • Pantry Extension

Why applications come back

  • Drawings that do not match the villa as it stands
  • AutoCAD in DLTM coordinates not supplied where asked
  • No stamped structural calculations
  • Unapproved works already on the VSR
  • Missing owner documents

Questions

Questions owners ask

Do I need approval to extend my kitchen in Al Furjan?

Yes — a Nakheel Home Modification NOC followed by a Trakhees CED building permit.

Who approves extensions in Al Furjan?

Nakheel through its Home Modification NOC, then Trakhees CED through the building permit.

Are AGFA fees charged?

Yes. Nakheel charges for added built-up area, currently about AED 1,400 per sq ft in Al Furjan.

Does Dubai Municipality issue the permit?

No — Al Furjan is under Trakhees, not DM.

Can you manage the whole extension approval?

Yes, from the footprint check to final sign-off.

Related guides

Keep reading