Telecom Equipment on a Post-Tensioned Slab Roof in Dubai
Many Dubai towers have post-tensioned slabs. Drilling into one without knowing where the tendons run can cut a cable that holds the slab up.
A post-tensioned slab has steel tendons under high tension inside the concrete. Drilling or coring into a tendon can damage the slab badly, so rooftop telecom equipment on a post-tensioned roof needs more care than on an ordinary slab. First we confirm whether the roof is post-tensioned, from the drawings or by site checks. Then the tendons are located and marked before any fixing, and we place the bases away from them, use shallow fixings or a ballasted frame, and check the slab for the new load.
How we handle it
Steps on a post-tensioned roof
| Step | What we do |
|---|---|
| Confirm | Is the slab post-tensioned? how to tell if a slab is post-tensioned |
| Locate | Tendons located and marked on site |
| Place | Bases set clear of the tendons |
| Fix | Shallow fixings or a ballasted frame |
| Check | Slab capacity for the new load |
Related
More on post-tensioned slabs
| Topic | Guide |
|---|---|
| Post-tensioned slab design | post-tensioned slabs |
| Roof penetrations | roof penetrations |
| Can the roof take the tower | whether the roof can support a tower |
Official sites: Dubai Municipality | DDA
What you need to know
- Tendons under tension.
- Locate before drilling.
- Bases placed clear.
- Slab checked.
Documents you will need
- Building structural drawings, if any
- Post-tensioning shop drawings, if any
- Roof photos
- Equipment list and layout
How it works
Post-tensioned roof steps
1. Drawings
Review.
2. Confirm
PT or not.
3. Locate
Tendons.
4. Layout
Bases.
5. Check
Slab load.
6. Report
Stamped.
Questions
Post-tensioned roofs: questions
Can I drill into a post-tensioned roof slab?
Only after the tendons are located and marked, and only where the design allows.
How do I know if the roof is post-tensioned?
Is a ballasted frame better on a post-tensioned roof?
It avoids drilling, if the roof can take the weight.
Who locates the tendons?
A specialist scanning contractor on site; we mark the safe zones on the drawings.
How much does it cost?
Our fee depends on the drawings and the scope; we review and advise.
Who can help?
Structural Solutions checks post-tensioned roofs for telecom equipment in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.