Camouflage Tower Structural Design in Dubai (Palm Tree and Facade)

In many communities and on building facades, a plain tower is not welcome. Camouflage towers hide the antennas inside a palm tree shape or behind facade panels.

A camouflage tower hides the antennas: a pole dressed as a palm tree, or antennas behind panels that match the building facade. The structure underneath is still designed to TIA-222, but the dressing changes the loads. Artificial fronds and trunk cladding add weight and catch wind, and facade screens take wind on a large flat area. We design the pole or frame, the fixings for the dressing and the foundation or the building support, so the hidden equipment stays safe and aligned.

TypesPalm tree, facade
Extra loadFronds and panels
CodeTIA-222

Types

Common camouflage options

TypeWhat we design
Palm tree polePole, fronds and trunk cladding fixings, foundation
Facade screenFrame behind panels that match the building
Rooftop enclosureScreened box around antennas on a roof

Extra loads

What the dressing adds

ItemEffect
FrondsWeight and wind area at the top
Trunk claddingWeight along the pole
Facade panelsWind on a large flat area
AccessOpenings for maintenance

Official sites: Dubai Municipality | DDA

What you need to know

  • Hidden antennas.
  • Dressing adds load.
  • TIA-222 underneath.
  • Fixings designed too.

Documents you will need

  • Camouflage supplier details
  • Equipment list
  • Site or building drawings
  • Soil report (ground poles)

How it works

Camouflage tower steps

1. Brief

Type, equipment.

2. Loads

Dressing weight, wind.

3. Structure

Pole or frame.

4. Fixings

Fronds, panels.

5. Support

Foundation or building.

6. Report

Stamped.

Questions

Camouflage towers: questions

What is a camouflage telecom tower?

A tower that hides the antennas, for example as a palm tree or behind facade panels.

Does the camouflage change the design?

Yes. The fronds or panels add weight and wind area.

Can antennas be hidden on a building facade?

Yes, behind screens on a frame we design.

How is wind load worked out?

See how wind load on a tower is calculated.

How much does it cost?

Our fee depends on the drawings and the scope; we review and advise.

Who can help?

Structural Solutions designs camouflage telecom towers and their fixings in Dubai. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.