Meraas plots · Utilities · Updated November 2026

Utility and DEWA Connection for a New Villa on a Meraas Plot

Power, water, telecom, gas and irrigation all reach the villa through the community. On the Meraas plots, the DCM NOCs come before the service providers connect.

On a Meraas plot, the utility connections come after the DCM NOCs. DCM issues its utility NOCs for the routes to the villa, and the right of way NOC covers any works outside the plot. Then each service provider handles its own connection: DEWA for power and water, the telecom operator, and the gas and irrigation providers for the community. Which provider applies depends on the service. The final DEWA connection follows the completion steps. We coordinate the NOCs and the applications with your contractor.

FirstDCM utility NOCs
ThenEach service provider
DEWAPower and water

Services

Who connects what

ServiceWho
Power and waterDEWA
TelecomThe telecom operator
GasThe community gas provider
IrrigationThe community provider
Routes and road worksDCM utility and right of way NOCs

Communities

Where this applies

The same step applies on the Meraas plots in Pearl Jumeirah, Naia Island, Jumeirah Bay, La Mer, Al Wasl (Le Hemaira) and Umm Al Sheif.

Official sites: DEWA | DDA

What you need to know

  • DCM NOCs first.
  • DEWA for power and water.
  • Provider depends on service.
  • We coordinate.

Documents you will need

  • DDA permit drawings
  • Electrical load details
  • Site plan with service routes
  • Contractor details

How it works

Utility steps

1. Routes

Service layout.

2. DCM

Utility NOCs.

3. ROW

If road works.

4. Providers

Applications.

5. Build

Connections.

6. Connect

After completion.

Questions

Utilities: questions

When can DEWA connect a new villa on a Meraas plot?

After the DCM NOCs and the completion steps.

Who provides gas and irrigation?

It depends on the service provider for the community.

Do utility works need a road NOC?

Yes, if they go outside the plot. See the right of way NOC.

What comes at the end?

the completion certificate.

How much does it cost?

Our fee depends on the drawings and the scope; we review your plot and advise. DCM, DDA, Civil Defence and service provider fees are separate, and we list them before you commit.

Who can help?

Structural Solutions handles every DCM, Civil Defence and DDA step for new villas on Meraas plots. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading