In The Springs, almost every change to your townhouse needs an Emaar NOC first and then a Dubai Municipality (DM) building permit: extensions, back terrace and balcony enclosures, wall removal, room conversions, garage conversion, pergolas and pools. Extensions are capped at 10% of the existing floor area, charged at AED 1,000 per sq ft. Structural Solutions prepares the drawings and calculations and takes the file from the Emaar NOC to the completion certificate.

Last checked: November 2026. Official sources: Emaar · Dubai Municipality

The Springs is one of the most renovated communities in Dubai, and almost every owner wants something: a bigger kitchen, an open living area, a study, a covered back terrace or a closed balcony. This guide puts all the approvals in one place, updated for November 2026.

The approval route for every Springs project

  1. Plans. Emaar provides the plans of your home. If the home has changed, we survey it and draw it as built (as-built drawings).
  2. Drawings and calculations. Architectural drawings and stamped structural calculations by our engineers.
  3. Emaar NOC. AED 2,000 in total, including the AED 500 submission fee, plus a refundable AED 10,000 deposit.
  4. Dubai Municipality building permit. The Springs building permit. Works start only after it is issued.
  5. Works and inspections, built to the approved drawings.
  6. Completion. Emaar inspects, gives its clearance and refunds the deposit; Dubai Municipality issues the completion certificate.

What you can do in The Springs, and what it needs

WorksWhat it needsGuide
Extension (ground or first floor)Emaar NOC, DM permit; counts toward the 10%Can I extend?
Back terrace extension or enclosureAdds floor area; counts toward the 10%Extension NOC
Balcony closureAdds floor area; counts toward the 10%Close my balcony
Wall removal or openingWall check by our engineers, Emaar NOC, DM permitOpen up walls
Study room conversionLayout change if walls, doors or windows changeAdd a room
Garage conversionEmaar NOC, DM permitGarage conversion
Kitchen extension or relocationLayout and MEP drawings, Emaar NOC, DM permitKitchen NOC
Maid roomCounts toward the 10%Maid room NOC
Room on the roofCounts toward the 10%; structural checkRoof room
Doors and windowsEmaar NOC; structural check for wider openingsWiden a door or window
PergolaEmaar NOCPergola NOC
Swimming poolEmaar NOC, DM permit, environmental NOCPool NOC
Solar panelsDEWA and EmaarSolar NOC
Painting and colourEmaar NOCPainting NOC
Boundary wall or gateEmaar NOCBoundary wall

How much can I add? The 10% rule

Springs homes are townhouses. Extensions, back terrace enclosures, balcony closures, maid rooms and roof rooms all add floor area, and together they are capped at 10% of the existing floor area. Anything above 10% is strictly reviewed by Emaar management and may not be approved. See how much bigger your home can be and the Springs types guide.

Wall removal and open-plan living

Opening the kitchen to the living room or joining two rooms is one of the most common Springs projects. Our engineers check each wall against the plans and on site before it is removed, and design any support where needed. The change goes on the Emaar NOC and the Dubai Municipality permit.

Study room conversion or a new study

Turning an existing room into a study is a layout change when walls, doors or windows change, and it needs the Emaar NOC and the permit. A new study built as an extension adds floor area and counts toward the 10%.

Back terrace extension and balcony closure

Enclosing the back terrace or closing a balcony turns outside space into floor area, so both count toward the 10% limit and need the Emaar NOC and the Dubai Municipality permit. An open pergola over the terrace is a separate, simpler pergola NOC.

Official fees

Official fees as of November 2026. Emaar and Dubai Municipality set these and can change them. Our engineering fee is separate and quoted after we review your home.

ItemFee
Emaar NOCAED 2,000 in total, including the AED 500 submission fee
Emaar security depositAED 10,000, refunded after clearance of the job
Added floor area (Springs townhouses)AED 1,000 per sq ft within the 10% limit, subject to Emaar Management approval
Dubai Municipality building permitApprox. AED 1,000 to 2,000
Emaar fine for works without NOC and permitsAED 10,000 to 50,000

More detail: Springs extension fees.

Works already done without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly. See selling with unapproved changes and the previous owner’s extension.

Questions owners ask

Do I need approval to renovate my Springs townhouse?

Yes, for any change to the structure, layout, facade or added area: an Emaar NOC, then a Dubai Municipality permit.

How much can I extend in The Springs?

Up to 10% of the existing floor area. Anything above 10% is strictly reviewed by Emaar management and may not be approved.

Can I enclose my back terrace in The Springs?

It adds floor area, so it counts toward the 10% limit and needs the Emaar NOC and the Dubai Municipality permit.

Can I remove a wall in my Springs townhouse?

Often yes, after our engineers check the wall. It needs the Emaar NOC and the permit.

Can I turn a room into a study?

Yes. If walls, doors or windows change, it is a layout change and needs approval. A new study built as an extension counts toward the 10%.

How much is the Emaar NOC fee in The Springs?

AED 2,000 in total, including the AED 500 submission fee, plus a refundable AED 10,000 security deposit. The Dubai Municipality permit is approx. AED 1,000 to 2,000.

Is The Springs DM or DDA?

Dubai Municipality. The Springs is in Emirates Living.

What if the works were done without approval?

Built works take an as-built route, not the new works route. A fine may apply, depending on the case. Contact us and we will help you accordingly.

Who can help with Springs approvals?

Structural Solutions prepares the drawings and structural calculations, applies for the Emaar NOC and the Dubai Municipality permit, and follows the file to the completion certificate. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related service

The Springs approvals

We check what your townhouse can add, prepare the drawings and calculations, and take the file through Emaar and Dubai Municipality to completion.

Springs modification NOC →Extension NOC →Completion →

Ask about my Springs home

Need this approved?

Send us photos and the location. We will tell you which approvals apply and handle them for you.