Question · Dubai Municipality · Updated November 2026

What Does a Steel Specialist Do on a Dubai Municipality Permit?

Your Dubai Municipality (DM) permit lists a steel specialist and you want to know what that party actually does, and why DM asks for one. Here is the split of roles, and where Structural Solutions fits.

On a Dubai Municipality (DM) permit, the steel specialist is the specialist steel contractor or subcontractor, appointed by the main contractor, that stamps the steel drawings and fabricates and installs the steel. DM asks for one so the steel works are carried out by a specialist in steel. The design side is separate: Structural Solutions, as consultant, prepares and stamps the structural calculations, coordinates the steel specialist stamp and follows the file until the final approval.

Steel specialistStamps, fabricates, installs
Appointed byThe main contractor
ConsultantCalculations and follow-up

Role

What the steel specialist is responsible for

TaskWho does it
Structural calculations and design drawingsConsultant (Structural Solutions)
Steel specialist stamp on the steel drawingsSteel specialist
Shop drawings and fabricationSteel specialist
Shop drawing check against the designConsultant; see steel shop drawing approval
Erection on siteSteel specialist
Submission, comments and follow-upConsultant, until the final approval

Why

Why Dubai Municipality asks for a steel specialist

ReasonWhat it means for you
Steel is fabricated off siteA specialist controls the steel quality, welds and bolts
Connections carry the loadConnections are built as designed; see steel connection design
One responsible steel partyDM knows who stamps and builds the steel

Official sites: Dubai Municipality

What you need to know

  • The steel specialist builds and stamps the steel.
  • The consultant designs and follows the file.
  • Main contractor appoints the steel specialist.
  • We coordinate the two sides.

Documents you will need

  • DM permit details
  • Steel drawings or concept
  • Main contractor details
  • Steel specialist details, if known

How it works

How the steel specialist fits into the work

1. Design

Our calculations.

2. Specialist

Appointed by the main contractor.

3. Stamp

Coordinated by us.

4. Shop drawings

Checked by us.

5. Site

Erection and inspection.

6. Final approval

We follow it.

Questions

Steel specialist role: questions

What does a steel specialist do on a DM permit?

Stamps the steel drawings and fabricates and installs the steel. The consultant designs the structure.

Why does Dubai Municipality ask for a steel specialist?

So the steel works are carried out and stamped by a specialist in steel, in addition to the consultant design.

Does the steel specialist prepare the calculations?

No. The consultant prepares and stamps the structural calculations. Our engineers do this.

Who appoints the steel specialist?

The main contractor. See who can be the steel specialist on a DM project.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions prepares the steel calculations, coordinates the steel specialist stamp and follows Dubai Municipality steel permits until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.