Question · DDA · Updated November 2026

Who Can Stamp Steel Calculations for DDA?

Steel works in Dubai Development Authority (DDA) areas such as Dubai Hills, Arabian Ranches, Business Bay, TECOM zones and Dubai Industrial City need DDA approval. Here is who stamps what, and how Structural Solutions takes the file to approval.

For Dubai Development Authority (DDA) approval, the consultant prepares and stamps the steel calculations and drawings, and the steel needs a steel specialist stamp recognised by DDA. Contractors working on DDA permits must be registered with DDA. Structural Solutions prepares the calculations, coordinates the steel specialist stamp and follows the file with DDA until the final approval.

CalculationsConsultant
Steel stampRecognised by DDA
AuthorityDubai Development Authority

Who stamps what

Who stamps what for DDA

DocumentStamped by
Steel structural calculationsThe consultant
Structural drawingsThe consultant
Steel design and fabrication drawingsA steel specialist recognised by DDA; see steel specialist stamp for DDA approval
Design reviewWhere DDA asks for it; see DDA steel design review

Areas

DDA areas and steel works

AreaTypical steel works
Dubai Hills, Arabian Ranches, The ValleyPergolas, canopies, staircases, villa extensions
Business Bay and Dubai Creek HarbourFit-out mezzanines, rooftop structures
TECOM zones and Dubai Industrial CityMezzanines, warehouses, sheds, platforms

Official sites: DDA

What you need to know

  • Two stamps: consultant plus steel specialist.
  • Contractors must be registered with DDA.
  • Developer NOC first in master communities.
  • We coordinate until final approval.

Documents you will need

  • Developer NOC where needed
  • Steel drawings or concept
  • Site photos
  • Contractor details

How it works

How we get steel calculations stamped for DDA

1. Brief

Works and plot.

2. Calculations

Prepared by us.

3. Steel stamp

Coordinated.

4. DDA

Submission and comments.

5. Final approval

We follow it.

Questions

DDA steel stamp questions

Who can stamp steel calculations for DDA?

The consultant stamps the calculations and drawings, and the steel needs a steel specialist stamp recognised by DDA.

Does DDA need a steel specialist stamp?

Yes, for steel works. See steel specialist stamp for DDA approval.

Must the contractor be registered with DDA?

Yes. Contractors working on DDA permits must be registered with DDA.

Can Structural Solutions do the calculations and the stamp?

We prepare the calculations and coordinate the steel specialist stamp, then follow the file until the final approval.

How much does it cost?

It depends on the drawings and the scope. We review them and advise.

Who can help?

Structural Solutions prepares steel calculations for DDA, coordinates the steel specialist stamp and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.