Who Can I Assign as the Steel Specialist for My Dubai Municipality Project?
Dubai Municipality (DM) asked for a steel specialist on your permit and you are not sure who qualifies or who appoints them. Here is the answer, and how Structural Solutions handles it with you.
On a Dubai Municipality (DM) permit, the steel specialist is a specialist steel contractor or subcontractor approved for steel works, and it is appointed by the main contractor on the permit. Structural Solutions, as your consultant, prepares the steel calculations and drawings, coordinates the steel specialist stamp with the main contractor and follows the file until the final approval.
Roles
Who does what for the steel works on a DM permit
| Party | Role |
|---|---|
| Owner | Appoints the consultant and the main contractor |
| Main contractor | Appoints the steel specialist contractor or subcontractor |
| Steel specialist | Stamps the steel and fabricates and installs it |
| Structural Solutions (consultant) | Steel calculations and drawings, coordination of the steel stamp, submission and follow-up until final approval |
| Dubai Municipality | Reviews, approves and inspects |
Situations
Common situations
| Situation | What to do |
|---|---|
| Main contractor has no steel specialist | The main contractor appoints one as a subcontractor; we coordinate the stamp |
| Permit on hold for the steel specialist | Send us the DM comment; we coordinate the appointment and the stamp |
| Steel fabricator is not approved for steel works | An approved specialist steel contractor or subcontractor is needed |
| Calculations missing | We prepare them; see steel structure calculations |
Official sites: Dubai Municipality
What you need to know
- Main contractor appoints the steel specialist.
- Specialist contractor or subcontractor: both are possible.
- We coordinate the stamp and follow until final approval.
- Calculations come from the consultant.
Documents you will need
- DM permit details and comments
- Steel drawings or concept
- Main contractor details
- Steel specialist details, if appointed
How it works
How we sort out the steel specialist on a DM permit
1. Comment
Send the DM request.
2. Calculations
We prepare or check them.
3. Appointment
Main contractor appoints the specialist.
4. Stamp
We coordinate it.
5. Submit
Until final approval.
Questions
Steel specialist on a DM permit: questions
Who can I assign as the steel specialist for my DM project?
A specialist steel contractor or subcontractor approved for steel works, appointed by the main contractor on the permit.
Who appoints the steel specialist on a DM permit?
The main contractor.
Can the steel specialist be a subcontractor?
Yes. It can be a specialist steel contractor or a subcontractor of the main contractor.
What does Structural Solutions do?
We prepare the steel calculations and drawings, coordinate the steel specialist stamp and follow the file until the final approval. See steel specialist for Dubai Municipality projects.
Is a steel specialist the same as an approved steel contractor?
Yes. Both names are used for the same role.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions coordinates the steel specialist on Dubai Municipality permits and follows the file until the final approval. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
Keep reading
Related
