Completion File Audit: Find Out What Is Missing
Not sure why your completion certificate (BCC) is not moving? Our completion file audit tells you exactly what is missing, what must be fixed and who needs to do what.
The completion file audit is the first step for any stuck file. We collect the permit, NOC, drawings, comments and photos, check the status with the authority and developer, inspect the site and give you a clear list: what is missing, what must be corrected, whether a contractor or consultant change is needed, and the steps to the certificate.
Checklist
What the audit checks
| Item | What we look for |
|---|---|
| Permit | Status, validity, contractor and consultant on file |
| Developer NOC | Validity, conditions and inspection items |
| Approved drawings | Available, complete and matching the permit |
| As-built drawings | Exist and match the site |
| Site | Differences, snags and safety items |
| Reports | Structural, test and fire safety records |
| Comments | Every open authority and developer comment |
| Owner documents | Owner letter, title deed and ID |
Outcome
What you get
| Result | Meaning |
|---|---|
| Ready to submit | We prepare the pack and book the inspection |
| Drawings needed | as-built drawings for the completion certificate |
| Site fixes needed | Site rectification plan |
| Contractor or consultant change | contractor change on a DM permit |
| Full takeover | completion certificate takeover service |
Official sites: Dubai Municipality | DDA | Trakhees
What you need to know
- First step for any stuck file.
- Clear list: what is missing and who fixes it.
- Site visit included.
- No guesswork: based on the actual comments.
Documents you will need
- Permit number
- Any drawings and NOCs
- All comments received
- Photos of the works
- Title deed and owner ID
How it works
How the audit works
1. Collect
All papers.
2. Status
Authority and developer.
3. Inspect
Site visit.
4. Report
Missing items.
5. Plan
Steps to the BCC.
Questions
Audit questions
What is a completion file audit?
A review of your permit, drawings, comments and site that lists exactly what is missing before the completion certificate.
Do I need an audit if I know the problem?
It is still useful: files often have more than one open item.
What happens after the audit?
We prepare the missing items or take over the file. See completion certificate takeover service.
Can you audit a file from another consultant?
Yes. See taking over from another consultant.
Is this for the BCC too?
Yes. The completion certificate is also called the BCC (Building Completion Certificate), and many owners simply call it sign-off.
How much does it cost?
It depends on the drawings and the scope. We review the file and advise.
Who can help?
Structural Solutions takes over stuck completion files. We audit the file, survey the works, prepare the as-built drawings and the owner letter pack, coordinate any contractor change and follow the developer and authority inspections until the completion certificate (BCC) is issued. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.