Strengthening and Concrete Repair Design Review for DDA
You already have a strengthening or repair design, from a contractor, a supplier or another engineer, and it needs to go to DDA. We review it, revise it where needed, coordinate the specialist stamp and submit it.
A design prepared by others can go to DDA once it is checked against the existing structure and the codes. We review the drawings and calculations, visit the site, mark up what must change, coordinate the strengthening specialist stamp and submit the Building Modification as the consultant.
What we check
What the review covers
| Check | Why |
|---|---|
| Existing structure and loads | The design must match what is built |
| Calculations | Capacity before and after |
| Method and details | Buildable and safe to install |
| Material data | Matches the design assumptions |
| Fire and durability | Protection where needed |
Who sends us designs
Who we review for
| Who | Typical case |
|---|---|
| CFRP applicators | Their system design needs the stamp and a consultant submission |
| Repair contractors | Repair method and details for DDA |
| Owners | A second opinion on a contractor's design; see second opinion |
| Consultants | Peer review; see structural peer review |
Official sites: DDA | Dubai Building Code
What you need to know
- We revise where the design needs it.
- Site visit before we sign anything.
- Specialist stamp coordinated after the review.
- Same route to DDA as our own designs.
Documents you will need
- The design drawings
- Calculations
- Material or system data
- Photos of the site
How it works
How the review works
1. Send the design
Drawings and calcs.
2. Review
Mark-ups.
3. Site visit
Matches the site?
4. Revise
Agreed changes.
5. Stamp
Specialist.
6. Submit
DDA.
Questions
Design review questions
Can you stamp a contractor's strengthening design?
After we review it and it meets the codes and the site. We revise what needs changing first.
Will you change the method?
Only where the review shows it is needed, and we agree it with you.
Is the stamp the same for repair designs?
It is the same strengthening specialist stamp. People call it the strengthening stamp, the concrete strengthening stamp, the concrete restoration stamp or the concrete repair stamp.
How much does it cost?
It depends on the drawings and the scope. We review them and advise.
Who can help?
Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
