Steel Specialist Stamp for DDA Approval
Steel works in a DDA area carry the consultant design and a stamp from a DDA approved steel contractor, also called a steel specialist. Here is who does what.
The consultant designs the steel and submits it to DDA. A DDA approved steel contractor (also called a steel specialist) stamps the steel works. DDA may also ask for third-party verification. We design, coordinate the steel specialist stamp and submit; we do not fabricate.
Roles
Roles on a DDA steel submission
| Role | What they do |
|---|---|
| Consultant | Steel design, calculations, connections and the DDA submission |
| Approved steel contractor (steel specialist) | Stamps the steel works |
| Third-party verifier | Checks the design when DDA asks |
| Fabricator | Shop drawings, fabrication and installation |
Official sites: DDA | Dubai Building Code
What you need to know
- Steel specialist = approved steel contractor.
- Consultant submits to DDA.
- We coordinate the stamp.
- Same idea with DM and Trakhees.
Documents you will need
- Drawings or photos of the steel works
- Location
- Developer NOC requirements
How it works
How the steel stamp is arranged
1. Design
Our engineers.
2. Stamp
Steel specialist.
3. Verification
If asked.
4. Submission
DDA.
One team
DDA steel calculations and stamp from one team
For Dubai Development Authority (DDA) steel works we prepare the calculations and drawings and coordinate the steel specialist stamp recognised by DDA, then submit and answer the comments.
- Steel calculations and stamp: one team
- Who can stamp steel drawings in Dubai
- Structural engineer for steel works
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Questions
Steel stamp questions
Can one company do the structural calculations and the steel stamp?
Yes. Structural Solutions prepares and stamps the structural calculations and drawings and coordinates the approved steel contractor (also called a steel specialist) stamp, so you deal with one team. See Steel calculations and stamp: one team.
Is a steel specialist the same as an approved steel contractor?
Yes. Both names are used for the same stamp.
Can my fabricator stamp the works?
Only if they are an approved steel contractor. We check and coordinate the stamp.
Is it the same with Trakhees and DM?
The idea is the same. See approved steel contractors.
Is it the same as the strengthening specialist stamp?
No. Strengthening designs have their own specialist stamp; see strengthening specialist stamp.
Who can help?
Structural Solutions assesses the structure, designs the strengthening or repair, coordinates the strengthening specialist stamp and submits to DDA as the approved consultant. A specialist contractor carries out the works. Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.