Fixing Into a Post-Tensioned Slab During Fit-Out
Ceilings, hangers and anchors in PT slabs: what fit-out contractors need to know.
Fit-out works often need fixings into the slab above for ceilings, services and signage. In a post-tensioned slab, fixings must stay within safe depths and away from tendons. Our engineers check the tendon drawings, define safe zones and fixing details, and support the building management approval.

Official sources: Dubai Municipality, Dubai Development Authority (DDA), Trakhees
What we check first
- Slab: PT or reinforced concrete
- Tendons: Layout and profile
- Loads: Use, finishes, services
- Openings: Size and position
- Records: As-built and tendon drawings
- Approval: Building management and authority
Documents you will need
- Building name and unit or plot number
- As-built structural and tendon drawings, if available
- Photos of the slab and the area
- What you want to design, open, core or fix
Route
How it works, step by step
Each project is reviewed first; the route follows the property and the authority.
| Step | Approval route | Guides |
|---|---|---|
| Records Building management or developer | As-built structural and tendon layout drawings. | — |
| Check Our engineers | Slab type, tendon positions and the proposed change or design. | Is my slab PT? |
| Scanning Specialist | Tendon scanning on site before any coring or drilling, where needed. | Coring a PT slab |
| Design Structural Solutions | PT design or assessment, drawings and stamped calculations. | — |
| Approval Building management and authority | NOC and permit for structural works. | — |
| Works Contractor and PT specialist | To the approved drawings. | — |
How it works
How it works
1. Send the details
Building, unit, drawings, photos.
2. Records
As-built and tendon drawings.
3. Check
Slab type and tendon positions.
4. Design
PT design or assessment.
5. Approval
NOC and permit.
6. Works
Contractor and PT specialist.
Related questions
What causes problems
- Coring or drilling without locating the tendons
- Cutting a tendon
- Openings without a structural design
Post-tensioned slab?
Check it first
Send us three things on WhatsApp:
- Building and unit or plot number
- Tendon or structural drawings, if you have them
- What you want to do
Our engineers design PT slabs and assess openings, coring and repairs in existing PT slabs.
Questions
Questions
Can I use normal anchors?
Only within safe depths and zones.
Who sets the safe zones?
The engineer, from the tendon drawings.
Does the mall or building need to approve?
Yes.
Do you prepare a fixing detail?
Yes, for the submission.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
