Engineering · Wind load

Wind Load Calculations in Dubai

Pergolas, canopies, signs, glass enclosures, windows and cladding: wind is usually the load that decides the design.

Wind load calculations in Dubai check that a structure, its connections and its fixings can safely resist wind pressure and suction at its location and height. They are asked for by developers, authorities, malls and building management for lightweight and exposed structures: pergolas, shade structures, canopies, signboards, glass enclosures, windows and doors, cladding and roof equipment such as solar panels. Our engineers calculate the wind loads, check the members, connections, anchors and supports, and issue a stamped report with the drawings for your NOC or permit.

Wind Load Calculations in Dubai

Official sources: Dubai Municipality · DDA

What we check

  • Location: Exposure and height
  • Shape: Pressure and suction
  • Members: Size and capacity
  • Fixings: Anchors and bolts
  • Supports: Footings, slab or wall
  • Report: Stamped for submission

Documents you will need

  • Drawings or a sketch with sizes
  • Material and profile details
  • Location and height (ground, roof, tower floor)
  • Photos of the supporting wall, slab or ground

By structure

Wind load calculations by structure

Each structure has its own guide. We confirm what your submission needs.

StructureApproval routeGuides
Pergolas and shade structures
Developer NOC
Members, fixings and footings or roof slab.Pergola wind load
Shade structures
Signboards
Authority signage permit, mall or landlord
Sign, frame and fixing to the building.Signage wind load
Glass enclosures
Developer or building management
Glass, frames and fixings.Glass enclosure wind load
Windows and doors
Developer, building or authority
Frames, glass and anchors.Window and door wind load
Canopies and cladding
Developer or authority
Panels, brackets and the supporting structure.Aluminium calculations
Solar panels and roof equipment
Developer NOC
Frames, ballast or fixings and the roof.Roof assessment for solar

How it works

How we prepare your wind load calculations

1. Send us the details

Structure, size, materials and location.

2. Site

Height, exposure and the supporting structure.

3. Wind loads

Pressure and suction on each part.

4. Design checks

Members, connections and fixings.

5. Report

Stamped calculations and drawings.

6. Submission

With your NOC or permit, comments answered.

Need wind load calculations?

Get a stamped report for your submission

Send us three things on WhatsApp:

  1. Structure and size
  2. Materials
  3. Location and height

Our engineers calculate the wind loads, check the fixings and prepare the report.

Questions

Questions

Do I need wind load calculations for a pergola?

Usually yes. Developers ask for stamped calculations that cover wind, members, fixings and footings.

Which structures need wind load calculations?

Lightweight and exposed ones: pergolas, shades, canopies, signs, glass enclosures, windows, cladding and roof equipment.

Does height matter?

Yes. Wind is stronger higher up, so a sign or glass on a tower needs more than one at ground level.

What if a structure was damaged by wind?

We inspect it, check what failed and design the repair or replacement.

What if it was already built without calculations?

Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading