Structural Calculations · Wind

Do shade structures need wind load calculations?

Yes. Pergolas, canopies, car shades and tensile shades must be designed for wind, with stamped structural calculations for approval.

The short answer

Yes. Shade structures such as pergolas, canopies, car shades and tensile shade sails catch the wind, so they must be designed for wind loads as well as their own weight. The structural calculations check the members, connections, fixings and foundations, and they are stamped for the developer and authority approvals. Steel structures also need specialist verification and a stamp.

NeededYes, for wind
ChecksMembers, fixings, foundations
SteelSpecialist verification and stamp

What you need to know

  • Wind: Shade structures act like sails.
  • Foundations: A soil test is needed where a substructure is built.
  • Calculations: Stamped for approval.
  • Approvals: Developer NOC and permit.

Documents you may need

  • Title deed and owner ID
  • Affection plan or site plan
  • Existing drawings or as-built drawings
  • Photos of the area
  • Developer NOC (where the community has a developer)

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Design brief
You and us
The size, use and loads of the structure.—
Calculations
Structural Solutions
Stamped structural calculations to the codes used in Dubai.Structural calculations
Drawings
Structural Solutions
Structural drawings that match the calculations.—
Approvals
Developer and authority
Submitted with the NOC and the building permit.Approvals
Inspection
Authority
Inspection and completion.Sign-off

Questions

Related questions

Do tensile shade sails need calculations?

Yes, especially for wind.

Do aluminium pergolas need calculations?

Yes.

What about the footings?

They are part of the calculations.

Who stamps them?

Our engineers.

Related guides

Keep reading