Wind load · Glass enclosures

Glass Enclosure Wind Load Calculations in Dubai

Glass around a terrace must resist the wind safely, and the outlet’s approvals follow.

A glass enclosure around a restaurant or cafe terrace must resist Dubai wind: the glass, frames and fixings, and the floor or structure they sit on. Our engineers calculate the loads and stamp the calculations. The enclosure also changes the outlet, so it goes through the landlord, developer or mall NOC, the authority permit, DM Food Safety layout re-approval and Civil Defence.

Glass Enclosure Wind Load Calculations in Dubai

Official sources: Dubai Municipality · DDA

What we check

  • Glass: Size and thickness
  • Frames: Sliding or folding
  • Fixings: Floor and ceiling
  • Exposure: Open terrace
  • Approvals: NOC, permit, DCD
  • Report: Stamped

Documents you will need

  • Drawings or a sketch with sizes
  • Material and profile details
  • Location and height
  • Photos of the supporting structure

Process

How we prepare the calculations

The general process. We confirm what your submission needs.

StepApproval routeGuides
Details
You
Drawings, sizes, materials and location.—
Wind loads
Our engineers
Pressure and suction for the location and height.—
Members
Our engineers
Glass and frames checked for wind.—
Fixings
Our engineers
Fixings and the supporting structure checked.—
Report
Structural Solutions
Stamped calculations and details.—
Submission
Approving body
With the NOC, permit or approval.—

How it works

How we work

1. Send us the details

Drawings, sizes and location.

2. Site

Height and supporting structure.

3. Loads

Wind pressure and suction.

4. Design

Members and fixings.

5. Report

Stamped calculations.

6. Submission

Comments answered.

What causes problems

  • Fixings not designed
  • Food layout not re-approved
  • No DCD approval

Need wind load calculations?

Get a stamped report for your submission

Send us three things on WhatsApp:

  1. Structure and size
  2. Materials
  3. Location and height

Our engineers calculate the wind loads, check the fixings and prepare the report.

Questions

Questions

Do glass enclosures need wind load calculations?

Yes, for the glass, frames and fixings.

Does it change my food approval?

Yes, any layout change needs DM Food Safety re-approval.

What if it was already built?

Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading