Club Villas Villa Maid Room Extension NOC (Dubai Hills)
Can I Add a Maid Room to My Club Villas Villa? A maid or driver room is a common addition in Dubai Hills.
Can I Add a Maid Room to My Club Villas Villa?
A maid or driver room in Dubai Hills is usually built in the side alley, 3 m from the villa or as the affection plan allows, as an independent structure that does not use the shared boundary wall. The room should be at least 6.5 m² and 2.13 m wide, with a bathroom of at least 2.79 m². It adds GFA, so Emaar charges on the added area. It needs the Emaar NOC, then a DDA permit, subject to Emaar’s review of your plot.

Official sources: Emaar · Dubai Development Authority (DDA)
What we check first
- Where: Side alley
- Size: 6.5 m², 2.13 m wide
- Bathroom: 2.79 m²
- Wall: Not the shared wall
- Area: Adds GFA
- Route: Emaar, then DDA
Documents you will need
- Villa and plot number in Club Villas
- Title deed and owner ID
- Photos of the villa and the area
- A sketch or short description of the idea
- Emaar as-built plans, if you have them
Route
The approval route in Club Villas
Emaar first, then DDA. We confirm the route for your villa.
| Step | Approval route | Guides |
|---|---|---|
| Early check Our engineers | Your idea, photos and plot. We get the as-built plans from Emaar and check them on site. | As-built drawings |
| Drawings Structural Solutions | Drawings and stamped structural calculations. | Structural calculations |
| Emaar NOC Emaar | Reviews the design against the Dubai Hills guidelines and issues the NOC. | Dubai Hills NOC guide |
| DDA permit Dubai Development Authority | Building permit for structural works. | DDA permit |
| Works Your contractor | Built to the approved drawings. | — |
| Completion Emaar and DDA | Inspections, Emaar clearance and the DDA completion certificate. | Completion certificate |
How it works
How it works
1. Send us the idea
Villa number, photos and what you want.
2. Villa plans
From Emaar, checked on site.
3. Early check
Guidelines, area and structure.
4. Drawings
Drawings and calculations.
5. Emaar NOC
We apply for you.
6. DDA permit
Then works and completion.
Related questions
What causes problems
- Using the shared boundary wall
- Room in front of the villa
- Too small to approve
Villa in Club Villas?
Check your idea first
Send us three things on WhatsApp:
- Villa number
- Photos of the area
- What you want to do
We check the Emaar rules and the structure, then handle the Emaar NOC and the DDA permit.
Emaar rates in Dubai Hills
Emaar extension fees per sq ft
Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.
| Added GFA | Rate (AED per sq ft) | Approval |
|---|---|---|
| Villas: up to 10% | AED 1,000 | Emaar NOC review |
| Villas: 10% to 20% | AED 3,000 | Subject to Emaar Management approval |
| Villas: 20% to 30% | AED 6,000 | Subject to Emaar Management approval |
| Villas: above 30% | AED 6,000 | Subject to Emaar Management approval |
| Townhouses | AED 1,000 | Within the townhouse limits, no higher bands |
Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.
Questions
Questions
Can I Add a Maid Room to My Club Villas Villa?
A maid or driver room in Dubai Hills is usually built in the side alley, 3 m from the villa or as the affection plan allows, as an independent structure that does not use the shared boundary wall. The room should be at least 6.5 m² and 2.13 m wide, with a bathroom of at least 2.79 m². It adds GFA, so Emaar charges on the added area. It needs the Emaar NOC, then a DDA permit, subject to Emaar’s review of your plot.
Where can it go?
Usually the side alley, as the affection plan allows.
Does it add GFA?
Yes, and Emaar charges on it.
What if it was already built?
Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.
Related guides
