Club Villas · Dubai Hills · Emaar

Club Villas Villa Extension NOC (Dubai Hills)

Can I Extend My Club Villas Villa in Dubai Hills? Adding space is possible, but every case is reviewed.

Can I Extend My Club Villas Villa in Dubai Hills?

Often yes, with the Emaar NOC and a DDA permit. There is no single extension figure in Dubai Hills: Emaar reviews each case against the guidelines for your villa, the plot and the setbacks. Emaar charges on the added GFA: AED 1,000 per sq ft up to 10%, AED 3,000 per sq ft from 10% to 20% and AED 6,000 per sq ft above 20%, everything above 10% subject to Emaar Management approval. Townhouses pay a flat AED 1,000 per sq ft. We measure your villa from the Emaar as-built plans and check the plot before design.

What we check first

  • Plot: Setbacks
  • Villa: Type and plans
  • Area: Added GFA
  • Structure: Walls and foundations
  • Look: Matches the villa
  • Fees: Emaar GFA rates

Documents you will need

  • Villa and plot number in Club Villas
  • Title deed and owner ID
  • Photos of the villa and the area
  • A sketch or short description of the idea
  • Emaar as-built plans, if you have them

Route

The approval route in Club Villas

Emaar first, then DDA. We confirm the route for your villa.

StepApproval routeGuides
Early check
Our engineers
Your idea, photos and plot. We get the as-built plans from Emaar and check them on site.As-built drawings
Drawings
Structural Solutions
Drawings and stamped structural calculations.Structural calculations
Emaar NOC
Emaar
Reviews the design against the Dubai Hills guidelines and issues the NOC.Dubai Hills NOC guide
DDA permit
Dubai Development Authority
Building permit for structural works.DDA permit
Works
Your contractor
Built to the approved drawings.—
Completion
Emaar and DDA
Inspections, Emaar clearance and the DDA completion certificate.Completion certificate

How it works

How it works

1. Send us the idea

Villa number, photos and what you want.

2. Villa plans

From Emaar, checked on site.

3. Early check

Guidelines, area and structure.

4. Drawings

Drawings and calculations.

5. Emaar NOC

We apply for you.

6. DDA permit

Then works and completion.

What causes problems

  • Designing before checking the plot
  • Assuming above 10% is automatic
  • Older unapproved works

Villa in Club Villas?

Check your idea first

Send us three things on WhatsApp:

  1. Villa number
  2. Photos of the area
  3. What you want to do

We check the Emaar rules and the structure, then handle the Emaar NOC and the DDA permit.

Emaar rates in Dubai Hills

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions

Can I Extend My Club Villas Villa in Dubai Hills?

Often yes, with the Emaar NOC and a DDA permit. There is no single extension figure in Dubai Hills: Emaar reviews each case against the guidelines for your villa, the plot and the setbacks. Emaar charges on the added GFA: AED 1,000 per sq ft up to 10%, AED 3,000 per sq ft from 10% to 20% and AED 6,000 per sq ft above 20%, everything above 10% subject to Emaar Management approval. Townhouses pay a flat AED 1,000 per sq ft. We measure your villa from the Emaar as-built plans and check the plot before design.

How much can I add?

It depends on your villa and plot. Emaar reviews each case.

What does Emaar charge?

AED 1,000 per sq ft up to 10%; higher bands subject to Emaar Management approval.

What if there are older works?

Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading