Hills Views · Dubai Hills · Emaar

Hills Views Villa Maid Room Extension NOC (Dubai Hills)

Can I Add a Maid Room to My Hills Views Villa? A maid or driver room is a common addition in Dubai Hills.

Can I Add a Maid Room to My Hills Views Villa?

A maid or driver room in Dubai Hills is usually built in the side alley, 3 m from the villa or as the affection plan allows, as an independent structure that does not use the shared boundary wall. The room should be at least 6.5 m² and 2.13 m wide, with a bathroom of at least 2.79 m². It adds GFA, so Emaar charges on the added area. It needs the Emaar NOC, then a DDA permit, subject to Emaar’s review of your plot.

What we check first

  • Where: Side alley
  • Size: 6.5 m², 2.13 m wide
  • Bathroom: 2.79 m²
  • Wall: Not the shared wall
  • Area: Adds GFA
  • Route: Emaar, then DDA

Documents you will need

  • Villa and plot number in Hills Views
  • Title deed and owner ID
  • Photos of the villa and the area
  • A sketch or short description of the idea
  • Emaar as-built plans, if you have them

Route

The approval route in Hills Views

Emaar first, then DDA. We confirm the route for your villa.

StepApproval routeGuides
Early check
Our engineers
Your idea, photos and plot. We get the as-built plans from Emaar and check them on site.As-built drawings
Drawings
Structural Solutions
Drawings and stamped structural calculations.Structural calculations
Emaar NOC
Emaar
Reviews the design against the Dubai Hills guidelines and issues the NOC.Dubai Hills NOC guide
DDA permit
Dubai Development Authority
Building permit for structural works.DDA permit
Works
Your contractor
Built to the approved drawings.—
Completion
Emaar and DDA
Inspections, Emaar clearance and the DDA completion certificate.Completion certificate

How it works

How it works

1. Send us the idea

Villa number, photos and what you want.

2. Villa plans

From Emaar, checked on site.

3. Early check

Guidelines, area and structure.

4. Drawings

Drawings and calculations.

5. Emaar NOC

We apply for you.

6. DDA permit

Then works and completion.

What causes problems

  • Using the shared boundary wall
  • Room in front of the villa
  • Too small to approve

Villa in Hills Views?

Check your idea first

Send us three things on WhatsApp:

  1. Villa number
  2. Photos of the area
  3. What you want to do

We check the Emaar rules and the structure, then handle the Emaar NOC and the DDA permit.

Emaar rates in Dubai Hills

Emaar extension fees per sq ft

Emaar charges on the added gross floor area (GFA). These rates apply across Emaar communities and are subject to Emaar's review and Emaar Management approval.

Added GFARate (AED per sq ft)Approval
Villas: up to 10%AED 1,000Emaar NOC review
Villas: 10% to 20%AED 3,000Subject to Emaar Management approval
Villas: 20% to 30%AED 6,000Subject to Emaar Management approval
Villas: above 30%AED 6,000Subject to Emaar Management approval
TownhousesAED 1,000Within the townhouse limits, no higher bands

Villa extensions above 10% are not automatic: Emaar Management decides case by case. Emaar confirms the final amount when it reviews the application. The DDA permit fee is separate.

Questions

Questions

Can I Add a Maid Room to My Hills Views Villa?

A maid or driver room in Dubai Hills is usually built in the side alley, 3 m from the villa or as the affection plan allows, as an independent structure that does not use the shared boundary wall. The room should be at least 6.5 m² and 2.13 m wide, with a bathroom of at least 2.79 m². It adds GFA, so Emaar charges on the added area. It needs the Emaar NOC, then a DDA permit, subject to Emaar’s review of your plot.

Where can it go?

Usually the side alley, as the affection plan allows.

Does it add GFA?

Yes, and Emaar charges on it.

What if it was already built?

Works already built take an as-built route: contact us and we help you accordingly. A fine may apply, depending on the case.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.

Related guides

Keep reading