Do I Need an RTA Right of Way NOC for Works Outside My Shop?

Ramps, awnings, kerbs, paving or seating on a public pavement all touch the right of way.

Yes, on a public road. Works or use of the pavement outside your shop affect the right of way, so RTA approval is needed, together with the authority for the area: Dubai Municipality, DDA or Trakhees. In communities, the developer approves first. We prepare the drawings and handle the RTA and authority approvals.

Public roadYes
PlusAuthority for the area
CommunityDeveloper first
Do I Need an RTA Right of Way NOC for Works Outside My Shop?

Official sources: RTA · Dubai Municipality · DDA · Trakhees · Dubai Civil Defence

What decides it

  • Ramps and steps: Sidewalk changes
  • Awnings: Over the pavement
  • Paving: Interlock and kerbs
  • Seating: Use of the pavement

Documents you will need

  • Trade licence and lease
  • Landlord or building NOC (or we request it with you)
  • Photos of the unit and the space in front
  • Existing drawings, if available

Route

The approval route

The general route. We confirm it for your shop and area.

StepApproval routeGuides
Developer or landlord
Developer, building or mall
In communities the developer must approve first; in malls, the mall management.—
RTA
RTA
Use of the pavement or right of way on a public road.RTA right of way NOC
Authority
DM, DDA or Trakhees
The authority for the area approves the use and any structure.—
Structure
Consultant
Awnings, canopies, ramps and enclosures designed and checked.Canopy calculations
Civil Defence
DCD
Where exits or fire safety are affected.—

How it works

How we get it approved

1. Send us the details

Area, building, unit and what you want to add.

2. We confirm the route

Developer, RTA, authority and DCD.

3. Site check

Structure and the space.

4. Drawings

Layout, structure, fire safety.

5. Approvals

We submit and follow up.

6. Completion

Inspection, then you open.

What causes problems

  • Works without RTA
  • Drawings not in RTA format
  • Skipping the developer

Extending your shop?

Get your route confirmed

Send us three things on WhatsApp:

  1. Area, building and unit number
  2. Photos of the unit and the space in front
  3. What you want to add

We confirm who approves it and handle the drawings and approvals.

Questions

Questions

Is RTA needed in a mall?

No, the mall decides inside the mall.

Is the authority also needed?

Yes, DM, DDA or Trakhees.

Do you prepare the drawings?

Yes.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.