Front of shop · Ownership

Who Owns the Pavement in Front of My Shop?

Your lease covers the unit. The pavement outside usually belongs to someone else.

On a public road, the pavement is part of the right of way, controlled by RTA with the authority for the area. Inside a master community, the developer controls it. In a mall, it belongs to the mall. The lease rarely includes it, so using it needs that body’s approval. We confirm who controls the space in front of your shop.

Public roadRight of way
CommunityDeveloper
MallMall
Who Owns the Pavement in Front of My Shop?

Official sources: RTA · Dubai Municipality · DDA · Trakhees · Dubai Civil Defence

What decides it

  • Lease: What it covers
  • Plot line: Where the unit ends
  • Right of way: Public pavement
  • Community: Developer areas

Documents you will need

  • Trade licence and lease
  • Landlord or building NOC (or we request it with you)
  • Photos of the unit and the space in front
  • Existing drawings, if available

Route

The approval route

The general route. We confirm it for your shop and area.

StepApproval routeGuides
Developer or landlord
Developer, building or mall
In communities the developer must approve first; in malls, the mall management.—
RTA
RTA
Use of the pavement or right of way on a public road.RTA right of way NOC
Authority
DM, DDA or Trakhees
The authority for the area approves the use and any structure.—
Structure
Consultant
Awnings, canopies, ramps and enclosures designed and checked.Canopy calculations
Civil Defence
DCD
Where exits or fire safety are affected.—

How it works

How we get it approved

1. Send us the details

Area, building, unit and what you want to add.

2. We confirm the route

Developer, RTA, authority and DCD.

3. Site check

Structure and the space.

4. Drawings

Layout, structure, fire safety.

5. Approvals

We submit and follow up.

6. Completion

Inspection, then you open.

What causes problems

  • Assuming the lease covers it
  • Building on public land
  • Skipping the developer

Extending your shop?

Get your route confirmed

Send us three things on WhatsApp:

  1. Area, building and unit number
  2. Photos of the unit and the space in front
  3. What you want to add

We confirm who approves it and handle the drawings and approvals.

Questions

Questions

Does my lease include the pavement?

Rarely. Check your lease; usually it ends at the shopfront.

Who controls a public pavement?

RTA, with the authority for the area.

What about communities?

The developer controls it.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.