RTA · Footpaths

Do I need RTA approval to work on the footpath?

Yes. Works on the sidewalk, such as a new driveway or access, need RTA approval, including the sidewalk modification permit.

Yes. The footpath belongs to the road, so works on it, such as a new driveway, curb cut, access ramp or interlock, need RTA approval. For plot access, the route is the RTA access design study, the developer plot access NOC where applicable, the RTA construction NOC and the RTA sidewalk modification permit, with drawings in DLTM coordinates. Structural Solutions prepares the drawings and applies.

NeededYes
IncludesSidewalk modification permit
DrawingsIn DLTM coordinates

What you need to know

  • Driveways: Follow the RTA access route.
  • Developer NOC: Where the community has one.
  • DLTM: Drawings in DLTM coordinates.
  • Deposit: Refunded after close-out.

Documents you may need

  • Title deed or trade licence
  • Affection plan or site plan
  • Site survey and drawings in DLTM
  • Developer NOC where applicable

Who does what

Step by step

We confirm the exact route for your project.

StepApproval routeGuides
Drawings
Structural Solutions
Layouts and drawings, in DLTM coordinates where required.—
RTA application
Consultant → RTA
The RTA NOC or permit for the works.RTA approvals
Works
Contractor
Carried out as approved.—
Close-out
RTA
Inspection and refund of any security deposit.Deposit refund

Questions

Related questions

Can I change the curb outside my villa?

Only with RTA approval.

What is the access design study?

The RTA study for a new plot access.

Do I need a site survey?

Yes, for DLTM drawings.

Who applies?

We do.

Related guides

Keep reading