Can I Add a Ramp or Steps Outside My Shop?
Changing levels at the shop entrance changes the pavement too.
Possibly, with approvals. A ramp or steps on a public pavement is a sidewalk change, so it needs RTA and the authority for the area: Dubai Municipality, DDA or Trakhees. In communities, the developer approves first. The design must keep the pavement safe for pedestrians. We prepare the drawings and handle the approvals.

Official sources: RTA · Dubai Municipality · DDA · Trakhees · Dubai Civil Defence
What decides it
- Levels: Entrance and pavement
- Slope: Ramp design
- Pedestrians: Safe path
- Drainage: Water flow
Documents you will need
- Trade licence and lease
- Landlord or building NOC (or we request it with you)
- Photos of the unit and the space in front
- Existing drawings, if available
Route
The approval route
The general route. We confirm it for your shop and area.
| Step | Approval route | Guides |
|---|---|---|
| Developer or landlord Developer, building or mall | In communities the developer must approve first; in malls, the mall management. | — |
| RTA RTA | Use of the pavement or right of way on a public road. | RTA right of way NOC |
| Authority DM, DDA or Trakhees | The authority for the area approves the use and any structure. | — |
| Structure Consultant | Awnings, canopies, ramps and enclosures designed and checked. | Canopy calculations |
| Civil Defence DCD | Where exits or fire safety are affected. | — |
How it works
How we get it approved
1. Send us the details
Area, building, unit and what you want to add.
2. We confirm the route
Developer, RTA, authority and DCD.
3. Site check
Structure and the space.
4. Drawings
Layout, structure, fire safety.
5. Approvals
We submit and follow up.
6. Completion
Inspection, then you open.
Related questions
What causes problems
- Building it without RTA
- Blocking the pavement
- Drainage ignored
Extending your shop?
Get your route confirmed
Send us three things on WhatsApp:
- Area, building and unit number
- Photos of the unit and the space in front
- What you want to add
We confirm who approves it and handle the drawings and approvals.
Questions
Questions
Is a ramp a sidewalk change?
Yes, on a public pavement.
Who approves it?
RTA and the authority, or the developer in communities.
Do you design it?
Yes.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.