City Walk · Shop merging

City Walk Shop Merging Approval

Planning to merge two shops or units in City Walk? Here is the route for the area.

City Walk

In City Walk, Meraas and the building approve the merge first, then the works are approved by DDA. The wall between the units is checked by a structural engineer and Civil Defence approves the merged layout. We confirm the route for your building and handle the approvals up to completion.

NOCMeraas and building
AuthorityDDA
ThenCivil Defence

What decides it in City Walk

  • Building: Its rules for merging
  • Wall: Load-bearing or not
  • Exits: For the merged unit
  • Shopfronts: One or two
  • Utilities: DEWA meters and load

Documents you will need

  • Title deeds, or the tenancy contracts with the owner's written NOC
  • Unit numbers and building name
  • Existing drawings of both units, if available
  • Photos of the wall between the units

Route

The shop merging route

The general route. We confirm it for your building and area.

StepApproval routeGuides
NOC
Meraas and building
Approval of the merge by the owner or landlord and the building management or developer.Combination NOC
Structural check
Consultant
We check the wall between the units and design the opening.Party wall assessment
Authority approval
DDA
We submit the merging drawings as your consultant.—
Civil Defence (DCD)
DCD
Fire and life safety for the merged layout: exits, alarms, sprinklers.DCD for merged shops
Utilities
DEWA
Meters and load for the merged unit, where needed.DEWA meters
Completion
Authority and DCD
Inspection and completion. The title deeds can then be updated at DLD where the owner wants it.Title deed

How it works

How we take your merge to completion

1. Send us the details

Area, building, both unit numbers and photos.

2. We confirm the route

NOC, authority and DCD for your building.

3. Structural check

The wall between the units.

4. Drawings

Merged layout, structure, fire safety, MEP.

5. Approvals

We submit and follow up.

6. Works and completion

By your contractor, then inspection.

Related guides

What stops a merge

  • Building management refusing
  • A load-bearing wall
  • Works started before approval

Merging two units?

Get your route confirmed

Send us three things on WhatsApp:

  1. The area, building and both unit numbers
  2. Photos of the wall between the units
  3. Shop, office or restaurant

We check the building and handle the NOC, the structural check, the authority, Civil Defence and completion.

Questions

Questions

Who approves shop merging in City Walk?

Meraas and the building first, then DDA, then Civil Defence.

Are City Walk shopfronts controlled?

Yes, frontage changes are reviewed by Meraas. We include them in the drawings.

How long does shop merging take?

It depends on the building, the area, the structure and the approvals involved. We review your case and tell you.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.