Does Trakhees Accept Structural Calculations From Any Engineer?
Calculations from the wrong engineer are a common reason for rejection.
No. Calculations for JAFZA are submitted by a consultant registered with Trakhees, in the Trakhees format, and steel works also need the approved steel contractor or specialist stamp. Calculations from an unregistered engineer or a supplier alone are not enough. We prepare and stamp the calculations and submit them.

Official sources: Trakhees · JAFZA · Dubai Civil Defence
What decides it
- Registration: With Trakhees
- Format: Trakhees format
- Steel: Specialist stamp
- Supplier data: Used as input only
Documents you will need
- Trade licence and lease
- Landlord NOC (or we request it with you)
- Existing drawings of the unit, if available
- Photos and what you want to change
Route
The approval route in JAFZA
The general route. We confirm it for your unit and works.
| Step | Approval route | Guides |
|---|---|---|
| Landlord NOC Step 1 | The landlord approves the works first. Trakhees approval alone is not enough. | JAFZA approvals |
| Drawings and calculations Step 2 | We prepare the drawings and stamped calculations in Trakhees format. | Structural calculations |
| Trakhees CED Step 3 | We submit as your consultant. Trakhees CED reviews and approves the works. | Who approves |
| Civil Defence (DCD) Step 4 | Fire and life safety, where the works affect it. | — |
| Inspection and completion Step 5 | Inspection, then the completion certificate. | Completion |
How it works
How we get it approved
1. Send us the details
Unit or plot, photos and what you want to do.
2. We confirm the route
Landlord NOC, Trakhees and any other approval.
3. Design
Drawings and stamped calculations.
4. Approvals
We submit to Trakhees and follow up.
5. Works
By your contractor, after approval.
6. Completion
Inspection and completion certificate.
Related guides
- JAFZA structural calculations
- Who can stamp structural calculations for JAFZA?
- Approved steel contractor stamp
What stops it
- Supplier calculations alone
- Engineer not registered with Trakhees
- Wrong format
Works in JAFZA?
Get your route confirmed
Send us three things on WhatsApp:
- Your unit or plot number
- Photos of the area
- What you want to build or change
We prepare the drawings and calculations, submit to Trakhees and follow up to completion.
Questions
Questions
Can I use my supplier's calculations?
As input. The submission comes from the consultant.
Is a DM-registered engineer enough?
For JAFZA, registration with Trakhees is what matters.
Do you stamp steel?
The steel stamp comes from an approved steel contractor or specialist. We coordinate it.
Who submits the approval in JAFZA?
An approved consultant submits it. We prepare the drawings and calculations and submit them for you; your contractor then carries out the works.
How do I contact you?
Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.