JAFZA · Your question

Should I Get a Structural Assessment Before Taking Over an Old JAFZA Warehouse?

Older warehouses can hide problems that only show when you add racking or a mezzanine.

It is recommended, especially if you plan racking, a mezzanine, cranes or roof equipment. We check the condition of the frame, roof and slab, look for cracks, corrosion and past changes, and tell you what the building can take for your plans. It helps you avoid surprises after signing.

RecommendedBefore signing
ChecksFrame, roof, slab
Useful forRacking, mezzanine, cranes
Should I Get a Structural Assessment Before Taking Over an Old JAFZA Warehouse?

Official sources: Trakhees · JAFZA · Dubai Civil Defence

What decides it

  • Condition: Cracks and corrosion
  • Slab: Capacity for your loads
  • Roof: Equipment and solar
  • Past changes: Approved or not

Documents you will need

  • Trade licence and lease
  • Landlord NOC (or we request it with you)
  • Existing drawings of the unit, if available
  • Photos and what you want to change

Route

The approval route in JAFZA

The general route. We confirm it for your unit and works.

StepApproval routeGuides
Landlord NOC
Step 1
The landlord approves the works first. Trakhees approval alone is not enough.JAFZA approvals
Drawings and calculations
Step 2
We prepare the drawings and stamped calculations in Trakhees format.Structural calculations
Trakhees CED
Step 3
We submit as your consultant. Trakhees CED reviews and approves the works.Who approves
Civil Defence (DCD)
Step 4
Fire and life safety, where the works affect it.—
Inspection and completion
Step 5
Inspection, then the completion certificate.Completion

How it works

How we get it approved

1. Send us the details

Unit or plot, photos and what you want to do.

2. We confirm the route

Landlord NOC, Trakhees and any other approval.

3. Design

Drawings and stamped calculations.

4. Approvals

We submit to Trakhees and follow up.

5. Works

By your contractor, after approval.

6. Completion

Inspection and completion certificate.

What stops it

  • Signing before checking
  • Planning heavy racking on a weak slab
  • Ignoring corrosion

Works in JAFZA?

Get your route confirmed

Send us three things on WhatsApp:

  1. Your unit or plot number
  2. Photos of the area
  3. What you want to build or change

We prepare the drawings and calculations, submit to Trakhees and follow up to completion.

Questions

Questions

Is it required by the authority?

Not always, but it protects you.

What do I get?

A report on the condition and what the building can take.

Can you check old approvals too?

Yes.

Who submits the approval in JAFZA?

An approved consultant submits it. We prepare the drawings and calculations and submit them for you; your contractor then carries out the works.

How do I contact you?

Contact our engineering team on WhatsApp or call us directly on +971 55 339 4451.