JAFZA · Your question

Can I Use a JAFZA Warehouse as a Workshop?

Workshops bring machines, noise, emissions and waste. Here is what changes.

Possibly, if the activity is allowed. A workshop or light industrial use needs the landlord NOC and the approvals for the new use, and may need the environmental NOC for emissions, waste or noise. Machines are checked for floor loads, and fire safety is reviewed for the activity. We check what your activity needs.

PossibleIf the activity is allowed
OftenEnvironmental NOC
CheckedMachines and fire safety
Can I Use a JAFZA Warehouse as a Workshop?

Official sources: Trakhees · JAFZA · Dubai Civil Defence

What decides it

  • Activity: What you make or repair
  • Environment: Emissions, waste, noise
  • Floor loads: Machines and foundations
  • Fire safety: Activity risks

Documents you will need

  • Trade licence and lease
  • Landlord NOC (or we request it with you)
  • Existing drawings of the unit, if available
  • Photos and what you want to change

Route

The approval route in JAFZA

The general route. We confirm it for your unit and works.

StepApproval routeGuides
Landlord NOC
Step 1
The landlord approves the works first. Trakhees approval alone is not enough.JAFZA approvals
Drawings and calculations
Step 2
We prepare the drawings and stamped calculations in Trakhees format.Structural calculations
Trakhees CED
Step 3
We submit as your consultant. Trakhees CED reviews and approves the works.Who approves
Civil Defence (DCD)
Step 4
Fire and life safety, where the works affect it.—
Inspection and completion
Step 5
Inspection, then the completion certificate.Completion

How it works

How we get it approved

1. Send us the details

Unit or plot, photos and what you want to do.

2. We confirm the route

Landlord NOC, Trakhees and any other approval.

3. Design

Drawings and stamped calculations.

4. Approvals

We submit to Trakhees and follow up.

5. Works

By your contractor, after approval.

6. Completion

Inspection and completion certificate.

What stops it

  • Activity not in the licence
  • No environmental NOC
  • Heavy machines without a slab check

Works in JAFZA?

Get your route confirmed

Send us three things on WhatsApp:

  1. Your unit or plot number
  2. Photos of the area
  3. What you want to build or change

We prepare the drawings and calculations, submit to Trakhees and follow up to completion.

Questions

Questions

Do machines need foundations?

Heavy or vibrating machines may. We check.

Is the environmental NOC always needed?

It depends on the activity.

Can you help with the environmental NOC?

Yes.

Who submits the approval in JAFZA?

An approved consultant submits it. We prepare the drawings and calculations and submit them for you; your contractor then carries out the works.