JAFZA Industrial Floor Slab Load Assessment
We assess warehouse floor slabs in JAFZA for racking, machinery, mezzanine columns and forklift loads, and design any strengthening needed.
What Is Checked
Slab thickness and reinforcement, point and line loads, joints and the ground below.
What you need to know
- When It Matters: High racking, heavy machines and new mezzanines are the most common causes of slab overload.
- Free-zone or developer NOC: JAFZA, DIP, Dubai South and other zones approve works first.
- Authority permit: from the authority for the zone.
- Civil Defence: fire and life safety approval for the activity.
- Slab and roof loads: racking, mezzanines and cranes are checked against the structure.
- Completion inspection: before operation.
Documents you will need
- Trade licence
- Lease agreement
- Master developer or free-zone NOC
- Layout, racking and equipment details
- Proposed drawings and stamped structural calculations
At a glance
JAFZA Industrial Floor Slab Load Assessment at a glance
Who does what, step by step.
| Who | Approval route | Guides |
|---|---|---|
| Structural engineer Step 1 | Designs structural changes, mezzanines and racking supports and prepares stamped drawings and calculations. | — |
| Master developer or free zone Step 2 | Issues the NOC for the works. | — |
| Authority — Trakhees Step 3 | Reviews the drawings and issues the permit. | — |
| Civil Defence (DCD) Step 4 | Fire and life safety approval where required. | — |
| Landlord and authority Step 5 | Completion inspection. | — |
How it works
How We Deliver Industrial Structural Approvals
Site Visit & Existing Drawings
Structural Assessment
Design & Stamped Calculations
Landlord / Zone NOC
Authority Approval
Installation & Sign-Off
Who does what
Who does what in JAFZA
Trakhees
Civil Engineering Department (CED): building permit for structural works and inspection at completion.
Trakhees approval →Structural Solutions
Prepares the drawings and stamped calculations and submits for you as the approved consultant.
Talk to our engineers →Industrial Works We Handle
- Racking Loads
- Machinery
- Mezzanine Columns
- Forklift Traffic
- Slab Cracking
- Strengthening
Why applications come back
- Drawings not in the format Trakhees asks for
- No stamped structural calculations
- Works started before the permit
- Missing landlord NOC or licence documents
- Fire safety items not shown
Questions
Questions owners ask
How much load can my warehouse slab in JAFZA carry?
It depends on its design — an engineer must assess it.
Who stamps industrial structural calculations?
An authority-registered structural consultant — for Trakhees, DM, DDA or Dubai South Authority depending on the location.
Do you check the existing structure?
Yes — slabs, columns, roofs and foundations are checked before new loads are added.
Can unapproved structures be regularised?
Often yes, with an assessment, calculations and a retrospective approval.
Is Civil Defence involved?
Often — fire and life safety approval is needed for many industrial activities.
Related guides
Keep reading
Related
