JAFZA Industrial Floor Slab Load Assessment

We assess warehouse floor slabs in JAFZA for racking, machinery, mezzanine columns and forklift loads, and design any strengthening needed.

What Is Checked

Slab thickness and reinforcement, point and line loads, joints and the ground below.

Free-Zone NOCFirst approval
Load CheckSlab, roof, racking
Civil DefenceFire and life safety

What you need to know

  • When It Matters: High racking, heavy machines and new mezzanines are the most common causes of slab overload.
  • Free-zone or developer NOC: JAFZA, DIP, Dubai South and other zones approve works first.
  • Authority permit: from the authority for the zone.
  • Civil Defence: fire and life safety approval for the activity.
  • Slab and roof loads: racking, mezzanines and cranes are checked against the structure.
  • Completion inspection: before operation.

Documents you will need

  • Trade licence
  • Lease agreement
  • Master developer or free-zone NOC
  • Layout, racking and equipment details
  • Proposed drawings and stamped structural calculations

At a glance

JAFZA Industrial Floor Slab Load Assessment at a glance

Who does what, step by step.

WhoApproval routeGuides
Structural engineer
Step 1
Designs structural changes, mezzanines and racking supports and prepares stamped drawings and calculations.—
Master developer or free zone
Step 2
Issues the NOC for the works.—
Authority — Trakhees
Step 3
Reviews the drawings and issues the permit.—
Civil Defence (DCD)
Step 4
Fire and life safety approval where required.—
Landlord and authority
Step 5
Completion inspection.—

How it works

How We Deliver Industrial Structural Approvals

Site Visit & Existing Drawings

Structural Assessment

Design & Stamped Calculations

Landlord / Zone NOC

Authority Approval

Installation & Sign-Off

Who does what

Who does what in JAFZA

🏭

JAFZA

Free zone authority. Its NOC comes first for works in a JAFZA plot or unit.

JAFZA approvals →
🏛️

Trakhees

Civil Engineering Department (CED): building permit for structural works and inspection at completion.

Trakhees approval →
📐

Structural Solutions

Prepares the drawings and stamped calculations and submits for you as the approved consultant.

Talk to our engineers →

Industrial Works We Handle

  • Racking Loads
  • Machinery
  • Mezzanine Columns
  • Forklift Traffic
  • Slab Cracking
  • Strengthening

Why applications come back

  • Drawings not in the format Trakhees asks for
  • No stamped structural calculations
  • Works started before the permit
  • Missing landlord NOC or licence documents
  • Fire safety items not shown

Questions

Questions owners ask

How much load can my warehouse slab in JAFZA carry?

It depends on its design — an engineer must assess it.

Who stamps industrial structural calculations?

An authority-registered structural consultant — for Trakhees, DM, DDA or Dubai South Authority depending on the location.

Do you check the existing structure?

Yes — slabs, columns, roofs and foundations are checked before new loads are added.

Can unapproved structures be regularised?

Often yes, with an assessment, calculations and a retrospective approval.

Is Civil Defence involved?

Often — fire and life safety approval is needed for many industrial activities.