Al Aryam NOC Documents Required

The Al Aryam NOC usually needs the scope of works, proposed drawings and owner documents. Other documents may be requested, depending on the team reviewing it.

For an Al Aryam NOC, you need the scope of works, the proposed drawings and the owner documents. Other documents may be requested, depending on the team reviewing the application, so the list can differ from one job to another. We prepare the drawings and put the package together. For existing drawings, the master developer can give you the as-built drawings, or we obtain them on your behalf.

ScopeScope of works
DrawingsProposed drawings
OwnerOwner documents

Mira Oasis

Mira and Mira Oasis guides

Official site: Dubai Development Authority (DDA). Structural Solutions is an independent engineering consultancy and is not part of Al Aryam, PMO or DDA.

What each document is for

  • Scope of works: A clear description of what will change.
  • Proposed drawings: We prepare these for you.
  • As-built drawings: From the master developer, or we obtain them on your behalf.
  • Other documents: Depends on the team reviewing the application.

Documents you will need

  • Scope of works
  • Proposed drawings
  • Owner documents
  • Other documents, if the reviewing team asks for them

How it works

How it works

1. Scope

You tell us what you want to change.

2. Drawings

We obtain the as-built drawings from the master developer, or on your behalf, and prepare the proposed drawings.

3. Al Aryam NOC

We get in touch with the Al Aryam engineering team and obtain the NOC.

4. DDA

Major works, including partition changes, go to DDA. For very minor works, we review and advise.

5. Gate pass

Your contractor gets the gate pass to work on site.

Who does what

Who is involved

🏘️

Al Aryam

Its engineering team reviews the application and issues the NOC directly.

Al Aryam NOC guide →
🏛️

Dubai Development Authority (DDA)

Issues the permit for major works, after the Al Aryam NOC.

Is Al Aryam under DDA? →
📐

Structural Solutions

An independent consultancy, not part of Al Aryam. We prepare the drawings, get in touch with the Al Aryam team and obtain the NOC.

Al Aryam NOC guide →

What can hold up an application

  • Scope of works not clear
  • Proposed drawings incomplete
  • Owner documents missing
  • The reviewing team asks for more documents

Questions

Questions owners ask

What documents does the Al Aryam NOC need?

The scope of works, proposed drawings and owner documents. Other documents may be requested.

Why might they ask for more?

It depends on the team reviewing the application.

Where do I get my villa drawings?

The master developer can give them, or we obtain them on your behalf.

Do you prepare the drawings?

Yes, we prepare the proposed drawings.